Dettson AMP1-IE2 Скачать руководство пользователя страница 37

 

6

WARNING 

When supply ducts carry air circulated by the 
furnace, the return air shall also be handled 
by a duct sealed to the furnace casing and 
terminating outside the space containing the 
furnace.  Incorrect ductwork termination and 
sealing will create a hazardous condition 
which could lead to bodily harm. 

 
 
When installing the furnace with cooling equipment for 
year round operation, the following recommendations 
must be followed for series or parallel air flow: 
 
 

IMPORTANT: 

The dampers should be 

adequate to prevent cooled air from entering 
the furnace, and if manually operated, must 
be equipped with the means to prevent 
operation of either the cooling unit or furnace 
unless the damper is in the full cool or heat 
position.

 

 
 
a.  In series airflow applications, the coil is mounted 

after the furnace in an enclosure in the supply air 
stream.  The furnace blow is used for both heating 
and cooling airflow. 

b.  In parallel flow installation, dampers must be 

provided to direct air over the furnace heat 
exchanger when heat is desired and over the 
cooling coil when cooling is desired. 

 
 

WARNING 

The coil MUST be installed on the air 
discharge side of the furnace. Under no 
circumstances should the airflow be such 
that cooled, conditioned air can pass over 
the furnace heat exchanger.  This will cause 
condensation in the heat exchanger and 
possible failure of the heat exchanger, which 
could lead to a fire hazard and/or a 
hazardous condition which, may lead to 
bodily harm.  Heat exchanger failure due to 
improper installation may not be covered by 
warranty. 

 
 
 
 
 
 

2.3)  Venting instructions (chimney 

installation): 

 
Venting of the furnace should be to the outside and in 
accordance with local codes or requirements of the 
local utility. 
 
OIL FIRED APPLIANCES SHALL BE CONNECTED 
TO FLUES HAVING SUFFICIENT DRAFT AT ALL 
TIMES TO ENSURE SAFE AND PROPER 
OPERATION OF APPLIANCE. 
 
For additional venting information refer to ANSI/NFPA 
211 Chimney, Fireplaces, Vents and Solid Fuel 
Burning Appliances and/or CSA B139 Installation 
Code. 
 
This furnace is certified for use with Type “L” vent 
(maximum flue gas temperature 575

o

F).  The flue pipe 

clearance knockout in the front top or side panel 
should be removed.  Install the flue elbow so that it 
exits the furnace cabinet through that opening.  
 
Pre-installation vent system inspection: 
 
Before this furnace is installed, it is highly 
recommended that any existing vent system be 
completely inspected. 
 
For any chimney or vent, this should include the 
following: 
 
a.  Inspection for any deterioration in the chimney or 

vent.  If deterioration is discovered, the chimney 
must be repaired or the vent must be replaced. 

b.  Inspection to ascertain that the vent system is 

clears and free of obstructions.  Any blockage 
must be cleared before installing this furnace. 

c.  Clearing the chimney or vent if previously used for 

venting a solid fuel burning appliance or fireplace. 

d.  Confirming that all unused chimney or vent 

connections are properly sealed. 

e.  Verification that the chimney is properly lined and 

sized per the applicable codes.  (Refer to list of 
codes on page 3.) 

 
Masonry Chimney: 
 
This furnace can be vented into an existing masonry 
chimney.  This furnace must not be vented into a 
chimney servicing a solid fuel-burning appliance.  
Before venting this furnace into a chimney, the 
chimney must be checked for deterioration and 
repaired if necessary.  The chimney must be properly 
lined and sized per local or national codes. 
 
If the furnace is vented into a common chimney, the 
chimney must be of sufficient area to accommodate 
the total flue products of all appliances vented into the 
chimney. 

Содержание AMP1-IE2

Страница 1: ...riqu par Produit de Confort International 3400 boul Industriel Sherbrooke Qc Canada D N S 0 3 7 6 R v A CONFORME AU CODE CSA B212 93 RENDEMENT ENERGETIQUE SAISONNIER Mod les AMP1 IE2 AMP2 IE2 AMP BMF...

Страница 2: ...es AMP1 IE2 BMF 090 LBM090 AMP2 IE2 BMF 125 LBM120 IMPORTANT Pour l installation de l vacuateur mural du syst me de combustion scell r f rer au manuel d installation du SCS 4 L appareil doit tre insta...

Страница 3: ...ons combustibles il peut donc tre install dans un placard ou un espace ferm similaire Comme cette unit peut tre install e en d bit ascendant en d bit descendant contre courant ou l horizontale l appar...

Страница 4: ...min e seulement Le r gulateur de tirage barom trique inclus avec l appareil de chauffage central devrait tre install dans la m me pi ce ou espace que l appareil de fa on viter toute diff rence de pres...

Страница 5: ...tation et de retour d air Si l application n cessite un fonctionnement extr mement silencieux l int rieur des 10 premiers pieds des conduites si possible d alimentation et de retour d air devrait tre...

Страница 6: ...l appareil de chauffage central par cette ouverture Dans le cas des installations l horizontale ou contre courant les formes pr d coup es d un des panneaux de c t seront utilis es Inspection pr alable...

Страница 7: ...ontal de dix 10 pieds de la chemin e Elle doit se prolonger d au moins cinq 5 pieds au dessus de la derni re bride fum e connect e j V rifiez les codes locaux pour toute divergence Chemin es fabriqu e...

Страница 8: ...hermostat sont emball es dans la bo te du thermostat fourni sur place Effectuer les connexions du thermostat telles qu indiqu sur les figures 6 1 6 8 aux bornes du panneau 24 volts du relais primaire...

Страница 9: ...n position verticale avec le contr le d allumage sur le dessus DANGER Ne pas utiliser l appareil de chauffage central comme appareil de chauffage de construction Une telle utilisation expose l apparei...

Страница 10: ...liser la trousse du test de fum e Bacharach ou un quivalent 3 Pour les installations avec chemin e afin d assurer un tirage ad quat dans l appareil de chauffage central installer le r gulateur de tira...

Страница 11: ...r f rer aux instructions incluses avec l appareil de chauffage central ou de br leur 9 Une fois que toutes les proc dures d installation mentionn es ci dessus ont t compl t es faire fonctionner le br...

Страница 12: ...pression totale doit se stabiliser entre 0 20 et 0 7 C E voir article 5 2 Le contact normalement ouvert ferme une pression de 0 8 C E et plus Donc les contacts PS 1 et PS 2 sont ouvert lorsque l appa...

Страница 13: ...ent d sactiver le syst me d arr t de s curit MISE EN GARDE Enlever le cavalier apr s les v rifications FIGURE 4 V rification de la pression B SCS La pression totale ne doit pas exc der plus 0 8 C E Si...

Страница 14: ...ion de la r sistance de la cellule au cadmium et les autres fonctions r f rer au manuel d instruction du contr le R7184 SECTION 3 ENTRETIEN Ne jamais faire fonctionner cet l appareil de chauffage cent...

Страница 15: ...fum e et la conduite d huile 10 R ajuster le br leur pour qu il fonctionne ad quatement 2 D MONTAGE DU VENTILATEUR Pour sortir le ventilateur de l appareil de chauffage central 1 teindre position OFF...

Страница 16: ...du technicien de service R SULTAT DU TEST DE MISE EN MARCHE Gicleur Pression lbs po 2 Ajustements du br leur Bande principale Bande fine Position de la t te CO 2 Indice de fum e Bacharach Temp rature...

Страница 17: ...urateur 0 6 1 3 1 5 2 4 1 6 SYST ME LECTRIQUE Volts Hertz Phase 115 60 1 115 60 1 Tensions de fonctionnement 104 132 104 132 Consommation Amp 12 2 Amp minimum p r grosseur du fil 13 7 18 1 Longueur ma...

Страница 18: ...S FOURNAISE OU PL NUM 2 2 2 HORIZONTALE LA CONDUITE PREMIERS 6 PI 2 2 3 DESSOUS FOURNAISE PLANCHER COMBUSTIBLE AVEC BASE 0 0 0 TUYAU FUM E HORIZONTALE OU SOUS LE TUYAU FUM E 4 4 4 VERTICALE AU DESSUS...

Страница 19: ...S FOURNAISE OU PL NUM 2 2 2 HORIZONTALE LA CONDUITE PREMIERS 6 PI 2 2 3 DESSOUS FOURNAISE PLANCHER COMBUSTIBLE AVEC BASE 0 0 0 TUYAU FUM E HORIZONTALE OU SOUS LE TUYAU FUM E 4 4 4 VERTICALE AU DESSUS...

Страница 20: ...FIGURE 6 1 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur Beckett 21 DNS 0635 R v A...

Страница 21: ...FIGURE 6 2 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur Beckett 22 DNS 0636 R v A...

Страница 22: ...FIGURE 6 3 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur Riello 23 DNS 0633 R v A...

Страница 23: ...FIGURE 6 4 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur Riello 24 DNS 0634 R v A...

Страница 24: ...FIGURE 6 5 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 et AMP2 IE2 LBM120 BMF 125 br leur Beckett et vacuateur SMH 25 DNS 0622 R v A...

Страница 25: ...FIGURE 6 6 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 et AMP2 IE2 LBM120 BMF 125 br leur Riello et vacuateur SMH DNS 0621 R v A 26...

Страница 26: ...FIGURE 6 7 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur B SCS 27 DNS 0643 R v A...

Страница 27: ...FIGURE 6 8 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur B SCS DNS 0644 R v A 28...

Страница 28: ...LISTE DE PI CES Mod les AMP1 IE2 LBM090 BMF 090 29 DNS 0187 Rev F Num ro de s rie sup rieure 172980 ou S0598V04041...

Страница 29: ...che B01679 02 24 Ass panneau de c t gauche B01885 02 COMPREND PANNEAU ISOLATION ET D FLECTEUR 25 Isolation du panneau de c t gauche B01645 02 26 Haute limite 195 30 F 1 75 R02R003 27 Garniture couverc...

Страница 30: ...LISTE DE PI CES Mod les AMP2 IE2 LBM120 BMF 125 31 Num ro de s rie sup rieur 173130 ou S0698V04191 DNS 0348 Rev F...

Страница 31: ...flecteurs et isolation 25 Isolation du panneau de c t gauche B01800 02 26 Haute limite 195 30 F 1 75 R02R005 27 Garniture couvercle de tuyau fum e B00205 28 Garniture bride de br leur N04Z026 29A Br...

Страница 32: ...22 14 MOTEUR N01Z017 15 COUDE 90 DEG 1 4 NPT X 1 4 TUBE G07H005 16 COUVERCLE BOITIER B02257 ITEM DESCRIPTION NUMERO 17 EPAULEMENT B00727 18 GARNITURE ESPACEUR B02231 02 19 ECROU HEXAGONAL 3 8 16 NC ZI...

Страница 33: ...ufactured by International Comfort Product 3400 Industriel blvd Sherbrooke Qc Canada D N S 0 3 7 6 R e v A COMPLIES WITH STANDARD CSA B212 93 SEASONAL ENERGY UTILISATION EFFICIENCY AMP1 IE2 AMP2 IE2 A...

Страница 34: ...the upflow configuration instructions on changing to other configurations are on this document It is shipped as a packaged unit complete with burner and controls It requires a line voltage 115VAC conn...

Страница 35: ...for in the support calculations Other methods of suspending are acceptable When installed in the Horizontal Position this furnace must not be installed on combustible flooring unless the approved sub...

Страница 36: ...and fuel lines and at other openings 2 2 Duct recommendations The proper sizing of warm air ducts is necessary to insure satisfactory furnace operation Ductwork should be in accordance with the lates...

Страница 37: ...s of the local utility OIL FIRED APPLIANCES SHALL BE CONNECTED TO FLUES HAVING SUFFICIENT DRAFT AT ALL TIMES TO ENSURE SAFE AND PROPER OPERATION OF APPLIANCE For additional venting information refer t...

Страница 38: ...flue collar j Check local codes for any variance Factory Built Chimneys May use listed factory built chimneys Refer to chimney manufacturer s instructions for proper installation 2 4 Air inlet and fl...

Страница 39: ...on bottom of the furnace to accommodate the return air ductwork A sufficient clearance should be provided for air filter access Refer to table 2 for filter rack flange dimensions for return air duct T...

Страница 40: ...e furnace must be installed as close to the breech of the furnace as possible In order for this device to function properly the barometric damper must be mounted with the hinge pins horizontal and the...

Страница 41: ...ipped with a 4 speed direct drive motor to deliver a temperature rise within the range specified on the rating plate between the return and supply pressure at the external duct static pressure noted o...

Страница 42: ...onds or 30 seconds depends on lockout timing maximum time is 41 seconds approximately 5 The control enters in lockout state see 5 3 article Note L 1 light ON during a certain time is an indication of...

Страница 43: ...15 or 30 seconds The motor ignition system and valve shut off Led flash at 1 Hz 1 2 second on 1 2 second off Depress reset button to return to power up sequence If reset button is pushed three times w...

Страница 44: ...lined in the oil burner instruction manual which came with the furnace After replacement of the nozzle the burner should be adjusted in accordance with the COMBUSTION CHECK section of the instructions...

Страница 45: ...einstall the blower Refer to wiring diagram figures 6 1 to 6 8 of this instruction or the diagram located on the inside of the blower door to properly rewire the unit CAUTION Be sure the blower is ade...

Страница 46: ...vice telephones day Night Dealer s name and address RESULT OF START UP TEST Nozzle Pressure lbpsi Burner adjustments Primary air Fine air Draw Assembly CO 2 Smoke scale Bacharach Gross stack temperatu...

Страница 47: ...75 70B 0 85 70W 1 00 70W Pump pressure PSIG 120 135 130 140 125 Combustion air adjustment band shutter 0 6 1 3 1 5 2 4 1 6 ELECTRICAL SYSTEM Volts Hertz Phase 115 60 1 115 60 1 Operating voltage range...

Страница 48: ...ACE OR PLENUM 2 2 2 HORIZONTAL WARM AIR DUCT WITHIN 6 FT OF FURNACE 2 2 3 BOTTOM FURNACE COMBUSTIBLE FLOOR WITH THE SUBBASE 0 0 0 FLUEPIPE HORIZONTALLY OR BELOW FLUE PIPE 4 4 4 VERTICALLY ABOVE FLUE P...

Страница 49: ...ACE OR PLENUM 2 2 2 HORIZONTAL WARM AIR DUCT WITHIN 6 FT OF FURNACE 2 2 3 BOTTOM FURNACE COMBUSTIBLE FLOOR WITH THE SUBBASE 0 0 0 FLUE PIPE HORIZONTALLY OR BELOW FLUE PIPE 4 4 4 VERTICALLY ABOVE FLUE...

Страница 50: ...19 FIGURE 6 1 Wiring diagram AMP1 IE2 LBM090 BMF 090 Beckett burner DNS 0488 Rev B...

Страница 51: ...20 FIGURE 6 2 Wiring diagram AMP2 IE2 LBM120 BMF 125 Beckett burner DNS 0489 Rev B...

Страница 52: ...21 FIGURE 6 3 Wiring diagram AMP1 IE2 LBM090 BMF 090 Riello burner DNS 0405 Rev B...

Страница 53: ...22 FIGURE 6 4 Wiring diagram AMP2 IE2 LBM120 BMF 125 Riello burner DNS 0406 Rev B...

Страница 54: ...23 FIGURE 6 5 Wiring diagram AMP1 IE2 LBM090 BMF 090 and AMP2 IE2 LBM120 BMF 125 Beckett burner and sidewall venter SMH DNS 0622 Rev A...

Страница 55: ...FIGURE 6 6 Wiring diagram AMP1 IE2 LBM090 BMF 090 and AMP2 IE2 LBM120 BMF 125 Riello burner and sidewall venter SMH 24 DNS 0621 Rev A...

Страница 56: ...FIGURE 6 7 Wiring diagram AMP1 IE2 LBM090 BMF 090 B SCS burner 25 DNS 0641 Rev A...

Страница 57: ...FIGURE 6 8 Wiring diagram AMP2 IE2 LBM120 BMF 125 B SCS burner 26 DNS 0642 Rev A...

Страница 58: ...PARTS LIST Model AMP1 IE2 LBM090 BMF 090 27 Serial number higher than 172980 or S0598V04041 DNS 0187 Rev F...

Страница 59: ...le B01679 02 24 Left side panel ass y B01885 02 INCLUDES PANEL INSULATION AND BAFFLE 25 Left side panel insulation B01645 02 26 Hi limit 175 20 F 1 75 R02R003 27 Gasket flue pipe cover B01214 28 Gaske...

Страница 60: ...PARTS LIST Model AMP2 IE2 LBM120 BMF 125 29 Serial number higher than 173130 or S0698V04191 DNS 0348 Rev F...

Страница 61: ...Left side panel insulation B01800 02 26 Hi limit 175 20 F 1 75 R02R005 27 Gasket flue pipe cover B00205 28 Gasket burner flange N04Z026 29A Beckett burner B00570 29B Riello burner N01F012 30 Hexagon n...

Страница 62: ...T B02234 13 PRESSURE SWITCH R99F022 14 MOTOR N01Z017 15 ELBOW 90 DEG 1 4 NPT X 1 4 TUBE G07H005 16 INLET COVER B02257 ITEM DESCRIPTION NUMBER 17 FLANGE B00727 18 GASKET FLANGE B02231 02 19 HEX NUT 3 8...

Отзывы: