![Desmi NSL 100-215 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/desmi/nsl-100-215/nsl-100-215_operation-and-maintenance-instruction_2487038045.webp)
INSTALLATION
DESMI Pumping Technology A/S
Tagholm 1
9400 Nørresundby
– Denmark
Tlf. nr.: +45 96 32 81 11
Fax +45 98 17 54 99
43
E-mail: [email protected] www.desmi.com
Figure 5-1: Marine & Offshore Installation
Figure 5-2: Land Base Installation
Pump installation foundation
should be in good condition and shape.
• All the edges of pump foot have full contact with the supporting brackets.
• Pipes shall be connected correctly and not overloading the pump flanges. Refer to
chapter 4.1
regarding max. permissible loads on the pump flanges.
• Pipe support shall be designed according to the pipe forces at every possible operating
condition, including cold/warm, empty/full, unpressurized/pressurized.
• All bolts on base plate / base frame shall be tightened with recommended torques.
• For Marine & Offshore installation, foundation should be made from proper steel plate or profile
steel with enough stiffness to support pump to run stably and reduce potential vibrations.
Содержание NSL 100-215
Страница 2: ......