If they are inadequate, causing excessive force on a release mechanism, the nickel-chromium
release cable will break, resulting in an unintended separation of the equipment column from the
anchor.
If an unintended release occurs, the cable/rope you attached to the vessel from the equipment
column via the mounting bracket will prevent the equipment from drifting away. Use the other
cable/rope to retrieve the anchor back onto the vessel's deck.
Consider adjustment to the type flotation device and/or weight-size of the payload in order to reduce
the force on the release mechanism.
Once adjustments are made, please re-test the equipment column by using the method above.
If the column is submerged so that the flotation device shows just below the surface of water, the release mechanism is
withstanding the buoyancy force and securely holding the column pulled under the water, then your evaluation is done and the
ARC station can be deployed in its current configuration.
STEP 8:
Slowly pull the anchor by the cable/rope back to the vessel's deck. Detach the safety cable/rope you
used to control the anchor's descent. Detach the safety cable/rope you used to secure the
equipment column.
10.3 Equipment Column Checklist
The following criteria must be met before you can continue!
●
The ARC unit(s) have a set of a fresh batteries installed
●
STM surface station is properly connected to a Personal Computer and the “Acoustic
Release Control” software is already running
●
Communication test between ARC unit and STM surface station was performed
successfully
●
The particular ARC unit you are about to deploy is registered in “Acoustic Release
Control” software
●
Battery charge levels are verified
●
Noise survey test of the deployment site is conducted and the STM surface station noise
“Threshold Level” is set for this particular site
●
The Serial Number of the ARC unit(s) is written down
●
Your own identifying marks have been implemented
If all the above steps are completed, only then execute the deployment procedure.
Содержание Acoustic Release Control System
Страница 3: ......
Страница 25: ......
Страница 33: ... Control Panel Device Manager Ports COM LPT ...
Страница 35: ......
Страница 44: ...STEP 6 Click Continue button The ARC unit will be added to the main window s list ...
Страница 62: ......