Denison Hydraulics Goldcup 6 Скачать руководство пользователя страница 12

 

SECTION V – ASSEMBLY PROCEDURES 

 

 

                      

 

 

 

 
ROCKER CAM ASSEMBLY

   

Position the rocker cam (24) on the cradle (20).  Note the marks made previously on the  

See Figure 3 

 

 

cradle and cam to indicate top.  (See marks in Figure 3.)  Marks will be used for assembly    

 

 

 

 

 

reference. 

 

VANE SEAL CARTRIDGES   

1.  Install O-ring (23c) around spacer (23d) and insert in the seal vane (23b). 

 

 

 

 

2.  Install check valve (23e) inside of spacer (23d) and assemble between the two backup    

 

 

 

 

 

     plates (23a) with the notched V’s exposed. 

 

 

 

 

3.  Install assembled cartridge in slot in cam as indicated in Figure 3.  Repeat steps 1, 2,    

 

 

 

 

 

     and 3 on other side of cam. 

 

 

 

 

4.  Install the four hold-down vanes (22) and springs (21) in the slots on each side of the  

 

 

 

 

 

 

     control vanes (23). 

 
 

CONTROL CHAMBER 

 

1.  Position both control chambers (17) on a clean flat surface with seal grooves turned up.   

 

 

 

  

     Drop the four steel balls (19) in the four counter-bored holes at each end of the seal  

 

 

 

 

 

 

     grooves. 

 

 

 

 

2.  Lubricate seals (18) and insert in seal grooves in control chamber (17). 

 

 

 

 

3.  The tapered side of the seals must be pushed into the grooves and the ends must cover  

 

 

 

 

 

     the steel balls. 

 

 

 

 

4.  Install the control chamber (17) with seal (18) and steel balls (19) assembled over the    

 

 

 

 

 

     control vane (23).  The seal must be against the cam.  Rotate the chamber until it  

 

 

 

 

 

 

     passes over the control vane assembly, then rotate in the opposite direction until the  

 

 

 

 

 

 

    1/4” dowel pins (16) can be pushed through the chamber (17) and into the cradle (20).   

 

 

 

 

     Install chamber in the same manner on the other side of the cam. 

 
 

 

 

 

     

NOTE:  Two sets of chamber covers are available.  The set marked CW must be    

 

 

 

 

 

     installed

 

in the right hand rotation pump and the set marked CCW must be used    

 

 

 

 

 

     in the left hand rotation pump.  (Rotation is determined facing the shaft end of  

 

 

 

 

 

 

     pump.)  The covers must be installed with the tubing holes and the tapped holes 

 

 

 

 

     at the top of the unit. 

 
 

 

 

 

5.  Install chamber covers (15r) and (15l) on the control chambers (17) over the dowel pins   

 

 

                          

 

     (16).  

The tapped holes must be at the top.  

Refer to the “T” marked on the rocker  

 

 

 

 

      

 

     cam (24) and cradle (20). 

 

 

 

 

6.  Install four 1/4 – 20 screws, two (11) and two (12), in each side and torque to 10 ft. lbs.  

 

 

 

 

7.  Install two 7/16-14 screws (10) in each side and torque to 45 ft. lbs. 

 

 

 

 

8.  Install O-ring 914) and plug (13) in each cover. 

 

 

 

 

9.  Install tubes (25) in reamed holes in each cover.  These tubes must be a tight fit.  If  

 

 

 

 

 

 

     tubes are loose, the ends can be expanded with a tapered punch. 

 

 

 

 

10. Tap  the tubes in place with a plastic mallet. 

 
 

SERVO ASSEMBLY 

 

1

.  

Install two orifice screws (8) in the servo stem (7).   

 

 

 

 

2.  Install servo plate with the screws through the servo stem.  The orifice screw end of the   

 

 

 

 

 

     servo stem must be against the servo plate. 

 

 

 

 

3.  Position the stem and plate on the rocker cam input side (at 9 o’clock on “B” model or  

 

 

 

 

     3 o’clock on “A” models) with the screws positioned over the 10-24 tapped holes.  Hold    

 

 

 

 

 

     the assembly against the cam and alternately turn the screws 1/2 turn each until the  

 

 

 

 

 

 

     stem and plate are firmly attached to the cam.  Torque the screws (6) to 40 in. lbs.   

 

 

 

 

 

 

     Install set-screws (6a) over the screws (6) and torque to 5 ft. lbs. 

 

 

 

 

 

     CAUTION:  

 

The screws must not protrude from the servo plate. 

 
 

 

 

 

 

PISTON AND SHOE ASSEMBLY 

1.  Install creep plate (5) over center post on rocker cam.  Small O.D. of plate must face the  

 

 

 

 

 

     cam. 

 

 

 

 

2.  Install the seven piston and shoes (4b) in the shoe retainer (4a).  Position the assembly   

 

 

 

 

 

     (4).  Position the assembly (4) over the center post and against the creep plate. 

 

 

 

 

3.  Install thrust washer (2) over center post. 

 

 

 

 

4.  Five different retaining rings (1) are available for the hold-down assembly.  Install the  

 

 

 

 

 

 

     thickest ring (1) with the dot up, that will fit in the groove on the center post and allow a    

 

 

 

 

 

     clearance of .002 to .004 between the shoe and creep plate.  Grasp one piston and lift    

 

 

 

 

 

     tightly against shoe retainer to measure this clearance. 

 

 

 

 

5.  The piston and shoe assembly (4) should be free to rotate by hand.  (5 ft. lbs. or less).     

 

 

 

 

 

     See Figure 4.

 

 
 
 
 
 
 
 
 
 
 
 

11 

Содержание Goldcup 6

Страница 1: ...DENISON HYDRAULICS SERVICE LITERATURE Axial Piston Motor Variable Displacement Goldcup Series M6H Model C Goldcup Series M7H Model A INSTALLATION OVERHAUL INSTRUCTIONS SVM M6 M7 G Revised 4 04...

Страница 2: ...of the basis of the bargain nor has same created or amounted to an express warranty that the products would conform thereto We are selling the goods and merchandise illustrated and described in this c...

Страница 3: ...am Cradle Assembly 7 SECTION IV ASSEMBLY TOOL DRAWINGS T1 T2 T3 8 T4 T5 9 Rework Limits 9 SECTION V ASSEMBLY PROCEDURES Drive Shaft Assembly 10 Barrel Holddown Shaft 10 Rocker Cam Stroking Assembly 11...

Страница 4: ...nd minimum displacement stops Additional optional controls are also available This unit is bi directional Table 1 TYPICAL CHARACTERISTICS Specification Term Goldcup 6 Goldcup 7 Displacement at max ang...

Страница 5: ...ndable service when properly applied and their systems properly maintained These general instructions apply to typical systems Specific instructions for particular equipment can be developed from them...

Страница 6: ...too small Suction line collapsed Suction strainer too small Suction strainer dirty Operating altitude too high Boost or replenishment pressure too low Replenishment flow too small for dynamic conditi...

Страница 7: ...capacitance line volume line stretch accumulator effects Reduce line size or lengths Eliminate hose Bleed air Pressure shocks Barrel blow off Re check pump hold down rotating group drain pressure Exce...

Страница 8: ...emainder of the shaft seal from the shaft Do not scratch seal area of the shaft 4 Remove snap ring 3 and the shaft and bearing assembly 1 Remove spacer or ring 2 HOUSING REMOVAL After shaft assembly h...

Страница 9: ...SECTION IV ASSEMBLY TOOL DRAWINGS 8...

Страница 10: ...nal Dimension Max Rework from Original Dimension Min Dimension After Rework Port plate face 315 305 010 295 Cylinder barrel face 4 480 010 4 470 Shoe retainer face 314 312 005 307 Piston shoe face poc...

Страница 11: ...own and insert tool figure SHAFT ASSEMBLY T 1 in the splined shaft hole in the barrel Figure 2 2 Place thrust washer 3 and spring 4 over shaft 2 in the same sequence as shown 3 Insert shaft 2 in barre...

Страница 12: ...Install chamber covers 15r and 15l on the control chambers 17 over the dowel pins 16 The tapped holes must be at the top Refer to the T marked on the rocker cam 24 and cradle 20 6 Install four 1 4 20...

Страница 13: ...x hd screws 1 4 20 x 2 1 4 13 2 488 35001 Hex socket plug SAE 4 14 2 691 00904 O ring 90 6290 4 1 033 70572 Right side chamber cover CW Rot 15R 15L 1 033 70571 Left side chamber cover CW Rot 16 4 324...

Страница 14: ...SECTION V ASSEMBLY PROCEDURES 13...

Страница 15: ...t the rocker cam to either extreme position in the cradle and position the barrel assembly with auxiliary shaft 1 directly over the pistons Start with the upper most piston and guide them one at a tim...

Страница 16: ...ll the hollow hex plug in bottom of housing 1 Roll pins 4 are in bottom half of housing HOUSING INSTALLATION See Figure 6 1 Install the three face plate pins 1 in the holes provided in the holes provi...

Страница 17: ...the port block 5 Install the port block assembly and port plate over the end of the auxiliary shaft Be certain that tubes 2 3 and 4 as shown on Fig 4 are seated and that the port plate 7 is still on...

Страница 18: ...tall cotter pin 5 through nut and shaft and bend one tang over the end of the shaft 3 Place O ring 7 on end cover 6 and lubricate Install end cover over hold down nut 4 4 Depress cover and install sna...

Страница 19: ...containing the rubber friction ring f and carbon ring c over the shaft with the carbon ring exposed Apply heavy grease to the square section rubber seal a and install on the cast iron seat b 2 Instal...

Страница 20: ...1 45003 Nylite Gasket 8 4 306 40144 Screw 9 1 033 71312 Servo Stem 10 1 033 70546 Balance Plate 11 2 033 71247 Spacer 12 2 358 10300 10 24 x 2 3 4 Soc HD Cap Screw 13 8 631 45007 Nylite Washer 14 8 35...

Страница 21: ...SECTION V ASSEMBLY PROCEDURES 20...

Страница 22: ...groove of plug 7 on internally drained shuttle 10 Install plug 7 over spring 9 and tighten 11 Install seal 17 in counter bore in the center of shuttle valve assembly Hold in place with a coating of g...

Страница 23: ...echt Holland Tel 31 78 6543 070 Fax 31 78 6175 755 Denmark DenisonHydraulicsDenmark A S Industrikrogen 2 2635 Ish j Denmark Tel 45 4371 15 00 Fax 45 4371 15 16 Finland Denison Lokomec Oy Polunm enkatu...

Страница 24: ......

Отзывы: