Chapter 7 Maintenance and Inspections
|
VFD-L-I Series
7-4
Revision July 2009, SW V1.1
DC capacity of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any leakage of liquid,
change of color, cracks or
deformation
Visual inspection
{
Measure static capacity when
required
Static capacity
≥
initial value X 0.85
{
Resistor of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any peculiar smell or
insulator cracks due to
overheating
Visual inspection, smell
{
If there is any disconnection
Visual inspection or measure with
multimeter
{
Transformer and reactor of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any abnormal vibration
or peculiar smell
Visual, aural inspection and smell
{
Magnetic contactor and relay of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there are any loose screws
Visual and aural inspection. Tighten
screw if necessary.
{
Check to see if contacts work
correctly
Visual inspection
{
Содержание VFD-L-I Series
Страница 1: ...PLC1 ir...
Страница 2: ......
Страница 3: ......
Страница 5: ...This page intentionally left blank...
Страница 91: ...Chapter 6 Troubleshooting VFD L I Series 6 6 Revision July 2009 SW V1 1 This page intentionally left blank...
Страница 99: ...Appendix A Specifications VFD L I Series A 2 Revision July 2009 SW V1 1 This page intentionally left blank...