
Chapter 8 Maintenance and Inspections
|
VFD-B-P Series
8-4
Revision April 2009, SW V1.00
DC capacity of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any leak of liquid,
color change, crack or
deformation
Visual inspection
{
Measure static capacity when
required
{
Resistor of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any peculiar smell or
insulator cracks due to overheat
Visual inspection, smell
{
If there is any disconnection
Visual inspection or measure with
multimeter after removing wiring
b1/+2 ~ -
Resistor value should be within
±
10%
{
Transformer and reactor of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there is any abnormal vibration
or peculiar smell
Visual, aural inspection and smell
{
Magnetic contactor and relay of main circuit
Maintenance
Period
Check Items
Methods and Criterion
Daily
Half
Year
One
Year
If there are any loose screws
Visual and aural inspection
{
Check to see if contacts work
correctly
Visual inspection
{
Содержание VFD-B Series
Страница 1: ...PLC1 ir...
Страница 2: ......
Страница 3: ......
Страница 11: ......
Страница 61: ...Chapter 3 Start Up VFD B P Series 3 4 Revision April 2009 SW V1 00 This page intentionally left blank...
Страница 171: ...Chapter 5 Parameters VFD B P Series 5 106 Revision April 2009 SW V1 00 This page intentionally left blank...
Страница 189: ...Chapter 8 Maintenance and Inspections VFD B P Series 8 6 Revision April 2009 SW V1 00 This page intentionally left blank...
Страница 206: ...Appendix B Accessories VFD B P Series Revision April 2009 SW V1 00 B 15 Order P N 08TDT1W4C4 Order P N 50TDS4W4C...
Страница 207: ...Appendix B Accessories VFD B P Series B 16 Revision April 2009 SW V1 00 Order P N 100TDS84C Order P N 150TDS84C...
Страница 224: ......
Страница 229: ...Appendix B Accessories VFD B P Series B 40 Revision April 2009 SW V1 00 This page intentionally left blank...