30
NOTE:
If you need to move the UPS, raise the brakes of the casters first.
Installation with the Balance Supports
If you want to install the UPS with the balance supports that have been removed from the UPS
during the unpacking process, please follow the following steps.
1. After you decide the installation area, follow the mounting hole diagram below to drill holes on
the installation ground.
(Figure 5-2
:
Mounting Hole Diagram)
Содержание Ultron HPH Series
Страница 14: ...Ultron HPH Series 13 2 6 Rear Panel Figure 2 3 20kVA UPS Rear Panel ...
Страница 80: ...Ultron HPH Series 79 Chapter 7 Touch Panel Display and Settings 7 1 Touch Panel Display Hierarchy ...
Страница 81: ...80 ...
Страница 105: ...104 ...
Страница 106: ...Ultron HPH Series 105 ...
Страница 113: ...112 ...
Страница 114: ...Ultron HPH Series 113 ...
Страница 132: ...5013285200 ...