
24
InfraSuite RowCool Precision Cooling –
Chilled Water
Chapter 4: Initial Startup
4.1 Pre Start-up Inspection
WARNING:
2QO\TXDOL¿HGVHUYLFHSHUVRQQHOFDQFDUU\RXWWKHLQVWDOODWLRQSURFHGXUHVLQWKLV
chapter.
2. The inner high voltage of this unit is potentially fatal! Make sure the input power
has been disconnected before the following actions.
3. A startup without correctly completing
4.1 Pre Start-up Inspection
may lead to
serious personal injury or equipment damage!
Please complete all the following inspections before implementing the initial startup procedures.
Inspection List
General items
There is not any damage around the device.
7KHXQLWLVVWDEO\¿[HGDQGFORVHWRWKHDGMDFHQWFDELQHW
All the installation procedures have been performed in accordance with the
instructions in
Chapter 3: Installation
.
The pipes in and outside the cabinet have been correctly connected and the
thermal insulating layer of the pipes are free of damage and leakage.
The front and back doors have been reinstalled and the cables of the control panel
have been connected.
Environment
The inner environment is an enclosed space and isolated from interference from
outside temperature and humidity.
The clearance zone surrounding the cabinet conforms to the regulation (please
refer to
3.2 Clearance zone
).
Electronic connection
The rated value of the input power conforms to that marked on the nameplate.
The equipment has been properly grounded.
All electronic connections are tight and stable.
Содержание RowCool HCH1CD0
Страница 59: ......
Страница 60: ...5013261500 ...