Delta Dual V4/V6
17.0 Self Commissioning
Commissioning requirements
Complete
Chamber is clear of silt and debris.
Check activation of float switches by hand making sure they can operate without obstruction.
Cable joining kits (if fitted) to be moved away from pumps/floats and secured.
Turn gate valve anticlockwise to ensure it is fully open.
Electrically isolate pump set to standard height (duty pump), fill chamber with water and check pump
discharges in less than 40 seconds.
While standard height pump is isolated, fill chamber with water and check the high level alarm sounds
(alarm should operate between pump 1 and pump 2).
Electrically isolate pump set to high level (backup pump), fill chamber with water and check pump
discharges in less than 40 seconds.
Check pipework is connected correctly (look for leaks).
Check all cables are securely cable tied to manifold and clear of float switches.
Check each pump is wired to an individual 13A non-switched spur.
Check each spur is wired to an individual 16A RCBO (not RCD).
Label spurs using stickers provided.
Check power is on.
Check battery backup is switched on correctly if available (refer to manual).
Any additional comments: (further space overleaf)
Name:
Inspectors Name:
Property Address:
Company Name & Address:
Property Contact:
Company Contact:
Date complete:
Property Signature:
Inspectors Signature:
Print Name:
Print Name:
Date:
Date:
Description of equipment (delete as appropriate):
Delta Dual V4 / Delta Dual V6
Location of Chamber:
Location of Alarm:
Location of Electrics:
Pump 1 Serial Number:
Pump 2 Serial Number:
Please scan this commissioning form and email to [email protected]