13.0 Maintenance
British Standards requires pump chambers to be serviced on a regular basis to ensure reliable operation of
equipment. PPS recommends that the pump station is serviced biannually.
PPS strongly recommends that a service agreement is taken out, please see the back page for further information.
14.0 Health and Safety
In order to minimise the risk of accidents when installing and servicing pump chambers, the following health and
safety guidelines should be followed:
•
Obey all health and safety hazards.
•
Observe strict cleanliness.
•
Ensure power to the pump chamber is isolated before carrying out any maintenance to the pump chamber.
•
Always ensure correct PPE is worn.
•
All personnel working with sewage chambers must be vaccinated against diseases to which they may
be exposed to.
• A first aid kit must be close to hand.
15.0 Guarantee
The Dual V4/V6 pump chamber comes with a 12 month component guarantee, which covers any manufacturing faults
and defects as a result of poor workmanship.
Pump chambers that have not been commissioned have a 12 month component guarantee from date of delivery.
Pump chambers that have been commissioned have a 12 month component guarantee from date of commissioning.
Any defects or malfunctions should be reported to Delta Membranes immediately to avoid any damage to other
components. All broken components must be sent to Delta Membranes at the customers cost. Any pumps to be
retuned must be returned complete with their cable attached.
We exclude all liability for any consequential or other damage or losses which may occur. We will not be liable if
the pumping system fails due to it having been incorrectly specified (e.g. where a pump is subjected to flow rates
higher than recommended or where a pump is used to discharge inappropriate fluids/solids, such as building
debris or materials).