Operation
Preparation for reading
Install access tubes
The
Profile Probe
must be used within an access tube. The
process of augering holes and installing access tubes is
described in the Augering Manual.
Equipment
You may require the following equipment for a site visit:
PR2 in protective tube
Access tube spacer
Spare
collars
caps
centring
springs
If setting up
logging:
Data logger (DL6 or
DL2e) and cable
For portable
reading: HH2
meter and
cable
Roll of paper
towels
Cleaning rod
10
z
Operation
Profile Probe User Manual
3.0a