Modulon NH Plus Series
1. SNMP Card................................................................................. 3-13
2. Programmable Relay I/O Card.................................................... 3-14
3. ModBUS Card............................................................................. 3-16
3-4 Other Optional Accessories ......................................................................... 3-17
1. Environmental Sensor ................................................................ 3-17
2. SNMP + Switching Hub .............................................................. 3-18
3-5 Technical Specification ................................................................................ 3-19
4.
Installation and Wiring ..................................................................................... 4-1
4-1 Before Installation........................................................................................ 4-1
4-2 Package Inspections ................................................................................... 4-1
4-3 Storing Conditions for Delayed Installation.................................................. 4-1
4-4 Installation Environment and Position ......................................................... 4-2
4-4-1 Handling Safety................................................................................ 4-2
4-4-2 UPS Position .................................................................................... 4-2
4-4-3 Installation Environment ................................................................... 4-4
4-5 Wiring .......................................................................................................... 4-5
4-5-1 Preparations..................................................................................... 4-5
4-5-2 Wiring (Single Unit) .......................................................................... 4-6
4-5-3 Connecting External Battery Cabinet ............................................... 4-8
4-5-4 Wiring (Parallel Redundancy, Single Input) ...................................... 4-10
4-5-5 Wiring (Parallel Redundancy, Dual Input) ........................................ 4-11
5.
Operating Procedures...................................................................................... 5-1
5-1 Startup Procedures (Single Unit) ................................................................. 5-1
5-2 Battery Startup Procedures (Single Unit)..................................................... 5-2
5-3 Shutdown Procedures (Single Unit) ............................................................ 5-2
5-4 Manual Bypass Startup Procedures (Single Unit)........................................ 5-3
5-5 Startup Procedures (Parallel Redundancy) ................................................. 5-4
5-6 Shutdown Procedures (Parallel Redundancy)............................................. 5-4
5-7 Manual Bypass Startup Procedures (Parallel Redundancy) ........................ 5-5
6.
Power Module Replacement............................................................................. 6-1
6-1 Status LED Indicators for Power Module..................................................... 6-1
6-2 Power Module Replacement ....................................................................... 6-2
Содержание NH Plus Series
Страница 17: ...3 General View 3 2 3 1 1 Dimension Fig 3 1 Power Unit 80KVA 520 1 1165 5 910 1 Fig 3 2 Power Unit 120KVA...
Страница 18: ...Modulon NH Plus Series 3 3 Fig 3 3 External Battery Pack 26AH Fig 3 4 External Battery Pack 40AH...
Страница 55: ...6 Power Module Replacement 6 3 Fig 4 4 Wiring Parallel Redundancy Single Input Fail On Off Fail On Off...
Страница 87: ......
Страница 88: ......