Chapter 1 Introduction
|
VFD-S Series
Revision August 2008, SE09, SW V2.61
1-3
1.3 Installation Steps
CASE
HEAT SINK
COVER
KNOB
SCREW
DIVISION
PLATE
Installation Steps
1.
Remove front cover screw and open.
2.
Remove Division Plate. If using optional
conduit bracket, please refer to next
page.
3.
Connect AC Input Power and motor leads.
Never connect the AC drive output
terminals U/T1, V/T2, W/T3 to main AC
Input power.
4. Reinstall
Division
Plate.
CONDUIT
BRACKET
SCREW
SCREW
For Optional Conduit Bracket:
Make sure to fasten both screws on conduit
bracket as shown in the drawing for safety
grounding purpose. Bring all the wires out
through the conduit bracket.
Screw Torque: 5 to 6 kgf-cm (4.3 to 5.2 in-lbf)
Содержание Network Device VFD-S
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 15: ...Chapter 1 Introduction VFD S Series 1 6 Revision August 2008 SE09 SW V2 61 This page intentionally left blank...
Страница 53: ...Chapter 3 Start Up VFD S Series 3 4 Revision August 2008 SE09 SW V2 61 This page intentionally left blank...
Страница 177: ...Appendix B Accessories VFD S Series B 20 Revision August 2008 SE09 SW V2 61 This page intentionally left blank...