of the rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws.
See item 2 in the following figure.
3.
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. See
item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 5. Two-Post Flush-Mount Configuration
12
Содержание S6010-ON
Страница 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Страница 2: ......
Страница 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Страница 6: ...4 ...
Страница 34: ...32 ...
Страница 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Страница 40: ...4 ...
Страница 68: ...32 ...
Страница 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Страница 74: ...4 ...
Страница 102: ...32 ...
Страница 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Страница 108: ...4 ...
Страница 136: ...32 ...
Страница 139: ......
Страница 140: ......