Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. See item
1 in the following figure.
2.
Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. See item 2 of the following figure.
3.
Repeat this procedure for the second rail.
Figure 6. Two-Post Center-Mount Configuration
13
Содержание S6010-ON
Страница 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Страница 2: ......
Страница 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Страница 6: ...4 ...
Страница 34: ...32 ...
Страница 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Страница 40: ...4 ...
Страница 68: ...32 ...
Страница 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Страница 74: ...4 ...
Страница 102: ...32 ...
Страница 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Страница 108: ...4 ...
Страница 136: ...32 ...
Страница 139: ......
Страница 140: ......