3. Use a user-supplied flat-head screwdriver to tighten the screws that secures the bare wires into the wiring block.
4. Remove the tape and plastic cover, the two M4 screws and one M5 screw from the PSU socket. Keep all the removed parts.
5. Attach the blue wire and black wire to the PSU socket. Secure the wires with the two M4 screws.
NOTE:
Attach the blue wire to the V- terminal. Attach the black wire to the V+ terminal.
6. Return the plastic cover back to the PSU socket.
7. Attach the yellow and green wire to the PSU GND. Secure the wire with the M5 screw.
Power supplies
33
Содержание S5448F-ON
Страница 1: ...Dell EMC PowerSwitch S5448F ON Installation Guide March 2022 March 2022 Rev A01 ...
Страница 24: ...OR 9 5 mm square hole rack OR EIA 7 1 mm 279 in round hole rack 24 S5448F ON switch installation ...
Страница 49: ...64 bytes from xx xx x xx seq 1 ttl 62 time 0 577 ms C Before you install an operating system 49 ...