6. Attach the outer rail to the front of the four-post rack. The rail clicks into place.
7. Repeat these steps for the second rail.
8. Slide the inner rails attached to the switch into the outer rails that are attached to the rails.
NOTE:
Press the spring clip on each outer rail to allow the switch to slide into the outer rail.
S5448F-ON switch installation
25
Содержание S5448F-ON
Страница 1: ...Dell EMC PowerSwitch S5448F ON Installation Guide March 2022 March 2022 Rev A01 ...
Страница 24: ...OR 9 5 mm square hole rack OR EIA 7 1 mm 279 in round hole rack 24 S5448F ON switch installation ...
Страница 49: ...64 bytes from xx xx x xx seq 1 ttl 62 time 0 577 ms C Before you install an operating system 49 ...