Figure 26. Installing the linking board and SATA cable
Next steps
1
Install the support bracket.
2
Install the air shroud.
3
install the sled into the enclosure.
4
Follow the procedure listed in
After working inside your system
.
Related link
Installing the support bracket
Installing the air shroud
Installing a sled
Processor and heat sink module
CAUTION:
This is a Field Replaceable Unit (FRU). Removal and installation procedures must be performed only by Dell certified
service technicians.
NOTE:
In a sled which has been configured with mixed CPUs – a fabric processor installed in the CPU2 socket and a non-fabric
processor installed in the CPU1 socket, you must connect the external Omnipath link cables to Port 2 on the OCP carrier card.
Use the following procedure when:
•
Removing and installing a heat sink
•
Replacing a processor
78
Installing and removing system components
Содержание EMC PowerEdge C6420
Страница 1: ...Dell EMC PowerEdge C6420 Regulatory Model E43S Series Regulatory Type E43S001 ...
Страница 8: ...Figure 1 Supported configurations for PowerEdge C6420 8 PowerEdge C6420 overview ...
Страница 64: ...Figure 12 Removing a sled 64 Installing and removing system components ...
Страница 66: ...Figure 14 Installing a sled 66 Installing and removing system components ...
Страница 99: ...Figure 45 Removing the expansion card filler bracket Installing and removing system components 99 ...