
22
xxx
|
Installation
xxx
Figure 2.6: Rotating the Switch Rails
2
Rotate each rail 180° (item 2) and then reassemble each rail to the switch
(item 3).
3
Refer to the 1U rear-rack instructions to insert and remove the switch
assembly from the ReadyRails system.
NOTE:
No blanking panel is required for this configuration.
0U Installation
1
Align and assemble the 0U mounting bracket to the switch rails (Figure 2.7,
item 1). Tighten the thumbscrews (item 2).
2
Insert the mounting bracket hooks into the rack holes and push down until
the blue button pops out and locks the bracket into place.
Содержание 1081AD
Страница 1: ...Dell Server Console Switch User s Guide ...
Страница 18: ...10xxx Product Overviewxxx ...
Страница 32: ...24xxx Installationxxx Figure 2 8 Basic SCS Configuration ...
Страница 38: ...30xxx Installationxxx Figure 2 10 Tiering the SCS With a UTP Analog Switch ...
Страница 40: ...32xxx Installationxxx Figure 2 11 Tiering Legacy Switches ...
Страница 46: ...38xxx Installationxxx ...
Страница 88: ...80xxx OBWI Operationxxx ...
Страница 112: ...104xxx Video Viewerxxx ...
Страница 116: ...108xxx Terminal Operationxxx ...
Страница 122: ...Appendix B Setup Port Pinoutsxxx xxx114 ...
Страница 134: ...Appendix E UTP Cablingxxx xxx126 ...
Страница 140: ...Appendix G Technical Supportxxx xxx132 ...