
Installation
xxx
|
xxx
17
Figure 2.2: Two-post Flush-mount Configuration
2
Attach one rail to the front post flange with two user-supplied screws (item
2).
3
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws (item 3).
4
Repeat this procedure for the second rail.
Содержание 1081AD
Страница 1: ...Dell Server Console Switch User s Guide ...
Страница 18: ...10xxx Product Overviewxxx ...
Страница 32: ...24xxx Installationxxx Figure 2 8 Basic SCS Configuration ...
Страница 38: ...30xxx Installationxxx Figure 2 10 Tiering the SCS With a UTP Analog Switch ...
Страница 40: ...32xxx Installationxxx Figure 2 11 Tiering Legacy Switches ...
Страница 46: ...38xxx Installationxxx ...
Страница 88: ...80xxx OBWI Operationxxx ...
Страница 112: ...104xxx Video Viewerxxx ...
Страница 116: ...108xxx Terminal Operationxxx ...
Страница 122: ...Appendix B Setup Port Pinoutsxxx xxx114 ...
Страница 134: ...Appendix E UTP Cablingxxx xxx126 ...
Страница 140: ...Appendix G Technical Supportxxx xxx132 ...