Figure 60. Installing the system board
3. Using a 5mm hex nut driver, secure the standoff screws that secure the system board to the chassis.
4. Using a Phillips #1 screw driver, secure the screws that secure the system board to the chassis.
Next steps
1. If not installed, install the Trusted Platform Module (TPM). For information about how to install the TPM, see the Installing the Trusted
Platform Module section. For more information about the TPM, see the Trusted Platform Module section.
NOTE:
The TPM plug-in module that is once installed is attached to the system board and cannot be removed. In the
event of a system board replacement, a TPM plug-in module is provided along with the system board for all systems
that have a TPM.
2. Replace the following components:
a.
b.
c.
d.
e.
f.
g.
3. Reconnect all cables to the system board.
NOTE:
Ensure that the cables inside the system are routed along the chassis wall and secured using the cable
securing bracket.
4. Follow the procedure that is listed in After working inside your system.
5. Ensure that you:
a. Use the Easy Restore feature to restore the Service Tag. For more information, see the
Restoring the system using Easy Restore
section.
b. If the Service Tag is not backed up in the backup flash device, enter the Service Tag manually. For more information, see the
Restoring the system using Easy Restore
c. Update the BIOS and iDRAC versions.
d. Re-enable the Trusted Platform Module (TPM). For more information, see the
Upgrading the Trusted Platform Module
section.
6. Import your new or existing iDRAC Enterprise license.
For more information, see iDRAC User's Guide, at
Installing and removing system components for PowerEdge C6525
77