Power on sequence
The ES30 shelf does not have a power-on button. The power cable must be connected
to a live power source in order for a shelf to be powered on.
Connect power to shelves
Note
The Data Domain system re-discovers newly configured shelves after it restarts but
the power cables need to be connected to a live power source to power a shelf.
Procedure
1. With the main power source off, connect an AC power cord (included with the
shelf) to the shelf’s power connector.
2. Secure the power cord with the retention bails at each connection. The bails
prevent the power cord from pulling out of the connections.
3. Repeat for each of the shelves.
4. Turn on the power source. When a shelf is powered on and functioning properly:
l
The shelf’s power LED is green.
l
Each Controller’s power LED is green.
5. Verify that there are no amber (fault) LEDs.
l
If the Power Supply Fault LED is steady amber, the power supply is faulty or
is not receiving AC line voltage. If it is flashing, either a multiple blower or
ambient over-temperature condition has shut off DC power to the system.
l
If the Controller Fault LED is amber, either the Controller or SAS connection
is faulty.
a. If there are amber LEDs, reseat or replace the power cable and check the
LEDs again.
b. Reseat the SAS cables. If there is still a problem, use different SAS cables.
c. Reseat the Controller module.
d. If the connection still has a problem, you need to replace the controller
module on either or both ends of the connection. The shelf controller module
B is placed above controller module A. See the next figure.
Post-Installation Tasks
Power on sequence
121
Содержание Data Domain ES30 Expansion Shelf
Страница 1: ...Dell EMC Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide 302 002 104 REV 04 ...
Страница 8: ...Revision history 8 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 16: ...Shelf Installation Overview 16 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 37: ...Figure 10 Recommended cabling for DD990 integrated with Avamar Installing the Shelves DD990 cabling 37 ...
Страница 43: ...Figure 13 Recommended DD2500 cabling Installing the Shelves DD2500 cabling 43 ...
Страница 49: ...Figure 15 Recommended DD4200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 49 ...
Страница 53: ...Figure 19 Recommended DD4500 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 53 ...
Страница 57: ...Figure 23 Recommended DD7200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 57 ...
Страница 69: ...Figure 31 Cabling for HA DD9500 DD9800 systems in one rack Installing the Shelves DD9500 and DD9800 cabling 69 ...