CHAPTER 4
Post-Installation Tasks
After you have installed and cabled the shelves in their racks, follow the instructions in
this chapter to complete the setup. This chapter covers these major topics:
l
............................................................................... 120
l
........................................................................................... 121
l
.................................................................................123
l
Add enclosure disks to the volume
....................................................................126
Post-Installation Tasks
119
Содержание Data Domain ES30 Expansion Shelf
Страница 1: ...Dell EMC Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide 302 002 104 REV 04 ...
Страница 8: ...Revision history 8 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 16: ...Shelf Installation Overview 16 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 37: ...Figure 10 Recommended cabling for DD990 integrated with Avamar Installing the Shelves DD990 cabling 37 ...
Страница 43: ...Figure 13 Recommended DD2500 cabling Installing the Shelves DD2500 cabling 43 ...
Страница 49: ...Figure 15 Recommended DD4200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 49 ...
Страница 53: ...Figure 19 Recommended DD4500 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 53 ...
Страница 57: ...Figure 23 Recommended DD7200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 57 ...
Страница 69: ...Figure 31 Cabling for HA DD9500 DD9800 systems in one rack Installing the Shelves DD9500 and DD9800 cabling 69 ...