Figure 83 Back panel: Identical shelf controllers (controller B above controller A)
1. Controller and power supply B
2. LEDs for power supply B
3. Controller and power supply A
4. LEDs for power supply A
Note
When replacing a component, note its orientation when removing it. Insert
the replacement in the same position.
Note
The power supplies of controller A is located at the top of the shelf and the
power supply of controller B is located at the bottom of the shelf.
6. If there are no amber LEDs, wait a few minutes after the final shelf was
powered on before restarting the Data Domain system.
Figure 84 Back panel: Power modules (controller B above controller A)
1. LEDs: Power Supply B: Power LED, Power fault: Amber, Blower fault:
Amber
Post-Installation Tasks
122
Data Domain ES30 Expansion Shelf and FS15 SSD Shelf
Hardware Guide
Содержание Data Domain ES30 Expansion Shelf
Страница 1: ...Dell EMC Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide 302 002 104 REV 04 ...
Страница 8: ...Revision history 8 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 16: ...Shelf Installation Overview 16 Data Domain ES30 Expansion Shelf and FS15 SSD Shelf Hardware Guide ...
Страница 37: ...Figure 10 Recommended cabling for DD990 integrated with Avamar Installing the Shelves DD990 cabling 37 ...
Страница 43: ...Figure 13 Recommended DD2500 cabling Installing the Shelves DD2500 cabling 43 ...
Страница 49: ...Figure 15 Recommended DD4200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 49 ...
Страница 53: ...Figure 19 Recommended DD4500 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 53 ...
Страница 57: ...Figure 23 Recommended DD7200 cabling Installing the Shelves DD4200 DD4500 and DD7200 cabling 57 ...
Страница 69: ...Figure 31 Cabling for HA DD9500 DD9800 systems in one rack Installing the Shelves DD9500 and DD9800 cabling 69 ...