Never turn on any equipment when there is an evidence of fire, water or structural damage.

Instructions

Refer to the figure 3 below to identify the connection terminals of 
the DLX inverter.

For safety reasons, an appropriately rated input load 
disconnector (20 A) must be provided for each individual DLX 
system. No load should be connected directly to the DLX inverter.

The protective earth conductor must have a cross-section at least 
equal to or greater than the cross-section of the cables for 
connection to the public grid (AC) and in any case in accordance 
with the requirements of local regulations.

WARNING: Local regulations in force in the country of installation 
may require the installation of an external additional DC 
disconnector for the PV input lines and an external additional DC 
breaker switch for the positive and negative lines of the battery. 
Both devices must be rated according to the maximum voltage 
and current values specified in the technical data specifications of 
the DLX.

The DLX inverter is equipped with an external earthing contact 
which must be connected to the protective conductor.

PV panels connection:

The DC disconnector of the PV input lines is integrated. The 
disconnector of the battery lines is also integrated and automatic. 
It is normally managed by the system control, but it can be 
voluntarily controlled by turning the ON/OFF switch to the "0" 
position in cases of maintenance/malfunction which require 
disconnection of the battery from the system. 

The voltage applied to each PV input channel of the DLX, 
determined at the minimum rated temperature for operation, 
must NEVER exceed 1000 V. Exceeding the limit can cause serious 
damage to the DLX.

Refer to the connection diagram shown in Figure 5_A if the 
system is based on two independent PV strings.

Refer to the connection diagram shown in Figure 5_B if the 
system is based on a single PV string connected to a single PV1 or 
PV2 input.

Refer to the connection diagram shown in Figure 5_C if the 
system is based on a single PV string connected to both inputs 
PV1 and PV2.

3. Electrical connections

AC grid and EPS Connections:

The power losses on the AC GRID line must be less than 1% of the rated 
power. 

The NEUTRAL conductor (N) of the EPS port is floating. 

For safety reasons, the operation of the EPS port is disabled as per DLX 
default factory setting. 

Before starting the connection operations, make sure that the external AC 
line main switch is disconnected and that the AC GRID and EPS circuit 
breakers are disconnected.

Before starting the connection operations, make sure that the DC line switch 
is off.

Before starting the connection operations, make sure that the ON/OFF switch 
is in the "0" position.

Do not carry out other operations on the inverter for at least 10 minutes. The 
inverter contains capacitors that need a minimum time to discharge.

Connect the phase (L1, L2, L3), neutral (N) and earth (PE) wires of the AC grid 
input to the GRID terminal block respecting the correct assignment.

Connect the phase (L1, L2, L3), neutral (N) and earth (PE) wires of the EPS 
output to the EPS terminal block respecting the correct assignment.

High Voltage Lithium-ion battery connection:

The default factory setting of the DLX is set to operate without any battery connected to the system. 

Contact Delios sales representative to identify the supported batteries.

Local regulations in force in the country of installation may require the installation of an external DC 
circuit breaker in addition to the automatic disconnector integrated in the DLX. The DC circuit breakers 
must be properly rated for the + and - lines in order to guarantee the safe disconnection of the battery 
from the inverter in case of maintenance.

The DLX is fitted with a safety fuse against battery short-circuits. The fuse is 30 A 1000 Vdc gPV rated. 
In the event of replacement, the fuse ratings must not be exceeded in any way as this could cause 
electric shock or fire in the event of a short circuit.

Before starting the connection operations, make sure that the battery cables are disconnected from 
the battery and that the poles are insulated to prevent short circuits.

Before starting the connection operations, make sure that the AC GRID and EPS circuit breakers are 
disconnected.

Before starting the connection operations, make sure that the internal DC line switch is disconnected.

Before starting the connection operations, make sure that the ON/OFF switch is in the "0" position. 

Use battery cables with cross-section of 6 mm² and with a maximum length of 3 m per cable.

Use the quick connectors supplied to connect the cables to the battery inputs of the DLX. 

Figure 3

Figure 4

Delios DLX 500HV/600HV/800HV/1000HV

Quick Start Guide

Figure 5_A

DELIOS

DLX Hybrid Inverter System 

Mar. 2022 

© 2022 Delios - All Rights Reserved

Figure 5_B

Figure 5_C

1 - ON/OFF switch
2 - DC switch
3 - PV1 string input
4 - PV2 string input
5 - BATTERY input
6 - AC GRID output
7 - EPS output
8 - ENERGY METER and BATTERY BMS wiring input
9 - LAN and AUX wiring input
10 - CAN wiring input

1 - AC GRID input
2 - EPS (Emergency Power Supply) output
3 - ENERGY METER
4 - AC LINE ciruit breaker
5 - AC GRID circuit breaker (

20A max

)

6 - EPS line circuit breaker (

20A max

)

7 - BATTERY DC circuit breaker (*)
8 - HV Li-ION BATTERY
9 - EXTERNAL INTERLOCK SYSTEM
10 - PRIVILEGED loads
11 - HOME loads

(*) Where required by local regulation

DLX must be installed only by a qualified personnel.

During installation, unplug DLX. Read and understand the safety warnings prior to installation.

Prior to the installation it is required to download (www.delios-srl.it/download-dlx-hv),
read, understand the step by step instructions from the latest DLX installation manual.

Содержание DLX 500HV

Страница 1: ...tica o qualsiasi capo di abbigliamento che possa influire sulla sicurezza personale Quando si effettua un operazione sull apparecchiatura gli indumenti e gli strumenti devono essere adeguatamente isol...

Страница 2: ...0 minuti L inverter contiene condensatori che necessitano di un tempo minimo per la scarica Collegare i fili di fase L1 L2 L3 neutro N e terra PE dell ingresso della rete AC alla morsettiera GRID risp...

Страница 3: ...ricity or any item of clothing that could affect personal safety When carrying out any operation on the equipment clothes and instrumentsmust be suitably insulated Optimal operation of the DLX system...

Страница 4: ...t other operations on the inverter for at least 10 minutes The inverter contains capacitors that need a minimum time to discharge Connect the phase L1 L2 L3 neutral N and earth PE wires of the AC grid...

Страница 5: ...protezioni o i coperchi possono essere rimossi solo 10 minuti dopo aver scollegato l inverter dall alimentatore per consentire ai suoi componenti di raffreddarsi e a scaricare eventuali dispositivi s...

Страница 6: ...DLX pu essere collegato alla rete di distribuzione solo nei paesi per i quali il sistema certificato L inverter DLX dotato di un contatto di messa a terra esterno che deve essere collegato al condutto...

Страница 7: ...of 40 C free of conductive contaminant NOTE The DLX system can only be installed by qualified personnel who needs to fully understand and apply provided safety instructions in order to avoid electrica...

Страница 8: ...ion network only in the countries which the system is certified for The DLX inverter is equipped with an external earthing contact which must be connected to the protective conductor in addition to th...

Отзывы: