
2222 Calibration routine in VPR100
Calibration routine in VPR100
Calibration routine in VPR100
Calibration routine in VPR100
After the first calibration it is important to take
reference values for the periodic checking of
the meters using the test probe. Please read
the instructions and recommendations from
ICAR on periodic checking of MM27BC and
how to collect reference values using a test
probe.
2.1
2.1
2.1
2.1 Equipment
Equipment
Equipment
Equipment
VPR100 Software later than 08C
PC cable
92987001
Programmer cable
91677780
2.2
2.2
2.2
2.2 Test Procedure
Test Procedure
Test Procedure
Test Procedure
1.
1.
1.
1. Find kits that include silicon tube service
items in original parts.
2.
2.
2.
2. Replace tubes with the service items.
1.
1.
1.
1. Verify that the vacuum level in the milking
parlour is between 42 and 44 kPa at low
line, 48 or 50 kPa at high line.
2.
2.
2.
2. Check the milk tube connections from the
milking cluster through the MM27BC up
to the milk line, Verify that there are no air
leaks.
3.
3.
3.
3. Check the condition of the milk cluster.
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
161 Preventive maintenance
11 (22)
© DeLaval 2012.All rights reserved.
Printout from Memoviewer 11/6/2012.