Assembly Instruction
DEGERtraker
Part III
– Structure
Assembly Elevation-Motor (EMO)
Assembly Instruction DEGER
traker
3000NT / 3000HD / 5000NT / 5000HD / 6000NT / 7000NT / 9000NT
2012-07-01
Page III-7
Manual operation:
When electrical components fail the systems can be moved into the horizontal position by using a 12V or
24V batterie.
When all electrical components fail the systems can be moved into the horizontal position by using standard
tools. For this the Aluminium-Cover at the lower side of the elevation motor has to be removed. After this
apply a spanner wrench (size 17mm) at the hexagonal nut at the end of the elevation motor and
turn slowly
(max. 30°/sec
==> 5 Upm)
clockwise.
ATTENTION! IMPORTANT OPERATING INSTRUCTIONS!
The expansion bellows may not be pinched, blocked or compressed, since this can lead to
damage to the internal parts.
A mechanical blockage of the movement of the piston rods is to be avoided since this can lead
to damage to the drive system.
The linear actuator must come to a complete stop before changing the movement direction.
A fast reversal of the travel direction of the actuator (for example with the aid of the CCB) is not
permitted.
CHECKING OF THE MECHANICS
Extend and retract the complete way of the drive, to guarantee that the mechanics moves freely,
does not knock against anything and that the cables are long enoungh. Use a 12V or 24V batterie
(for ex. suitable for a batterie-driven drill) for the head of the drive.
ATTENTION!
Disconnect the Elevation-Motor from the Energy-Converter by loosen clamp 1 and 2 before
beginning with this work.