Report of implementing
DEGERtraker
Assembly Instruction DEGER
traker
3000NT / 3000HD / 5000NT / 5000HD / 6000NT / 7000NT / 9000NT
2012-07-01
Page VI-3
Type:
•
DEGER
traker
3000NT
•
DEGER
traker
7000NT
•
DEGER
traker
3000HD
•
DEGER
traker
5000NT
•
DEGER
traker
9000NT
•
DEGER
traker
5000HD
•
DEGER
traker
6000NT
(Please fill in using capital letters so it is easily legible!!)
Operator:
Installer/Planer:
Name:
_______________________________
Name:
_______________________________
Address: _______________________________
Address: _______________________________
Telephone:_______________________________
Telephone:_______________________________
Delivery date:
______________________________
Delivery note number:
______________________________
Please also attach a copy of the delivery note!!!
Date of implementing:
______________________________
Name of the solar park:
______________________________
Number of systems:
______________________________
Serial number:
(Tracker)
______________________________
(please mention complete serial number)
Assembly:
•
free standing traker
•
traker integrated in building
•
total height __________m
(top edge module surface)
•
standard-mast
•
Mast extension_______m
Inplementing
A
A
conecter East-West axle is mounted pointed upwards above the solar module surface
conecter elevation axle is mounted laterally at the solar module surface
Measured data
current consumption motor elevation
current consumption motor east-west
locking fluid EL-motor is applied
Control of the assembly
reinforcement of the foundation was build in due to the plan
hole sphere of action is free of objects
mechanic moves freely, cables are long enough
cable connection of the EL-motor on the lower side
Control of the function
East-West drive rotates towards the brightest spot
Elevation drive rotates towards the brightest spot
Test wind monitor setting (> 12m/s)
dimensions of module arrangement are abode
symetrical arrangement of the modules according to the modul layout and assembly instructions
lightning protection and grounding is connected
Date: ______________________________
Signature: ______________________________
Signature: ______________________________
(Operator)
(Installer/Planer)
IMPORTANT INSTRUCTIONS
!!
The commissioning protocol must be filled in when the system is first commissioned, and faxed
within 4 weeks of commissioning (at the latest 3 months after delivery) to DEGERenergie GmbH
+49 7451 5391410
or sent by e-mail to
.
The protocol is ready for download at
www.degerenergie.com
!