Assembly Instruction
DEGERtraker
Part II
– Foundation and mast
Assembly of the mast
Assembly Instruction DEGER
traker
3000NT / 3000HD / 5000NT / 5000HD / 6000NT / 7000NT / 9000NT
2012-07-01
Page II-3
Example for mounting on concrete wall C20/25:
Dimensions:
Free standing tracker:
Tracker building integrated:
ATTENTION!
It is necessary to dimension the mounting for
every system separately according to the
conditions on site.
The calculations are to be assigned to a local
structural engineer who is responsible for the
present building!