
Assembly Instruction
DEGERtraker
Part V
– Control unit
CCB and Wind guard, Sunlight Sensor, Security Sensor
Assembly Instruction DEGER
traker
3000NT / 3000HD / 5000NT / 5000HD / 6000NT / 7000NT / 9000NT
2012-07-01
Page V-7
CCB and Wind guard
It's possible to control up to 200 DEGER
trakers
manually using the optional CCB.
Activating the joystick can override the
Tracker tilts in steep position
automated operation. Every installation
connected to the CCB will move in the
direction the joystick determines.
Tracker moves to west
Tracker moves to east
Tracker moves into save position
If the joystick is brought back into the neutral position (0), all
the DEGER
trakers
return to the automatic operation mode.
The wind sensor function takes priority over manual control.
If the wind alarm has been triggered, the DEGER
traker
moves into a horizontal position. Automatic or
manual operation will only be possible again once the wind velocity has dropped below the value set for it.
(After 10 minutes at the earliest)
The wind guard is set to a triggervalue at the factory. Under no circumstances may this value be increased.
Changing this value automatically entails a complete loss of warranty for the entire system.
Assembly Site for Wind guard and CCB:
The Assembly location for the CCB can be freely selected
– though
not directly next to the inverter
. It is
recommended to install the CCB within a building at an inaccessible place for unauthorized people. A
detailed assembly instruction is appended to the CCB.
The wind guard should be assembled at a point exposed to the wind, near the DEGERtraker above the
upper edge of the module. An installation on the DEGERtraker is possible with the optional "Pendulum for
wind guard". A detailed assembly instruction is appended to the Pendulum.
Feed Line to the Wind guard:
Measurement lines are not to be laid in parallel to other electrical lines and are to be shielded as of a length
of 10 meters (max. 30m), for example JY-ST-Y. It is not permitted to connect the shield of the cable to GND.
Use terminal screws and moisture proof boxes for extension.
Sunlight Sensor
The Sunlight Sensor continuously measures the insolation. At less than 100W/m², for example on cloudy
weather or twilight, the tracker will move into flat position.
Installation of Sunlight Sensor:
Install the sunlight sensor with the spire on top at a light exposed position. Please note that the sensor must
not be shaded at any point during the day. A detailed assembly instruction is appended to the Sunlight
Sensor.
Security Sensor
The Security Sensor detects snow and ice cover on the modules and is delivered preinstalled and calibrated.
Upon reaching a preset snow mass, DEGER
traker
moves to its max. vertical position to let snow and ice slide
off.
Installation of Security Sensor:
The Security Sensor is installed on the underside of the module. A detailed assembly instruction is appended
to the Security Sensor.