5. To return to the main display, press the MENU key once.
Tab.7
Accessing
the menu
Menu
Description
See
1x MENU
SEtP 1
Setting the required number of water heater
baths
User Guide
1x
SE nS 2
Measurements menu
Measurements menu section
2x
CL OC 3
Setting the time and date
User Guide
3x
Pr oG 4
Modifying a timer program
User Guide
4x
Co un 5
Counters
Counters section
5x
PA rA 6
Setting parameters
User Guide
6x
Er bL 7
Error history
Log of messages and faults section
7x
Co dE 8
Installer parameters
Section on Modifying the installer parameters
8x
SErV 9
Servicing the filter
Section on Cleaning and replacing the filter
9x
TSHF 10
Radio range test
This menu is only available in Radio mode
Radio test menu section
6.2
Points to check before commissioning
1. Check that the thermodynamic water heater is full of water.
2. Check the tightness of the connections.
3. Check that the safety devices are working correctly.
4. Check the operating mode.
6.3
Commissioning the appliance
6.3.1
Initial commissioning
Caution
Initial commissioning must be performed by a qualified
professional.
Carry out the commissioning operations in the following order:
1. Connect to the mains.
2. Check that no error codes or messages are shown on the display.
Important
When powering on for the first time, the control module will
automatically pair with the water heater control system PCB.
Important
The domestic hot water temperature set point is factory-set to
55°C in comfort mode.
3. Select the Boost operating mode.
4. The compressor and the back-up start to produce domestic hot water
if there is a domestic hot water production request.
For more information, see
Pairing the control module and the tank, page 48
Selecting the operating mode, page 49
6 Commissioning