For the right position of the device;
Do not place on the cooker or similar cooking devices.
Do not leave combustion products inside device installed room.
Heating sensitive walls (for example wooden walls) must be protected with
steady insulation.
Before the installation, wash the all system pipes carefully for removing any
residual things that can give damage to operation of the device. In case of
leakage cause from overpressure of heating system, place water colleting
channel that has suitable discharge pipe under safety valve. There is no need
to have safety valve for tap water cycle but be sure that waterworks is not
exceed the 6 bar. If you suspect about this, you can have pressure reduce
valve installed.
Device installation place must be far way from blockers, obstruction parts and
bulges during repairing and maintenance.
Electric connection of the device must be made with suitable cable, fuse and
residual current device and grounding absolutely must be made.
Installation wall of the device must be as durable as carrying the weight of the
device.
From under and upper part of the device ,drill min 2 pcs suitable diameter
holes to the place which is chosen as suitable according to clauses
determined above. Fasten suitable fixing plugs to holes. Screw the device to
holes from up and down. Screw from more point when it is needed.
Heating system must be drawn with suitable diameter pipe for providing
enough circulation of heating water. Choosing radiatorpipes smaller than it is
5.2 WALL INSTALLATION OF DEVICE
5. 2.1 Connection of Heating System and Plumbing
Содержание Naviels UKDAX-10EDT
Страница 5: ...3 CONFIGURATION OF THE DEVICE...
Страница 7: ...Boiler installation must be done by authorized personnel 5 INSTALLATION OF BOILER...
Страница 26: ...7 ELECTRICAL DIAGRAM...