device is opened. Silt trap is needed after filling valve. Filling process must be
done by implementing following instructions.
Open filling tap until water pressure indicator comes between 1 and 1, 5
bar.
Close the filling tap when filling is completed.
When the air collected inside radiators is discharged, it can be reduce at
radiator water pressure. Be sure by checking radiator water pressure is
between 1 and 1, 5bar. If there is decrease, it must be completed by
opening filling tap.
It must be checked studiously if there is water leakage or not.
Electrical installation must be done by authorized person according to device
capacity and with suitable diameter cable which is determined according to
cable length. Electrical installation must have suitablespecification for cut off
boiler power and residual current device that has ampere value and fuse
separately. Fuse must be near to device. Grounding of device must absolutely
be done. If there is not grounding at the place that device was installed,
grounding must be made for device authorized person. Grounding must be
controlled if it is operative or not by authorized personnel in determined period.
Fuse must be located near the device; there must be cable after fuse which is
enough as making connection to device. Connection of cables to device must
be made by authorized personnel.
Cable diameter that is calculated according to device capacity and cable
length, residual current device and fuse values can be seen at the following
table.
5.2.2 ELECTRICAL CONNECTIONS
Содержание Naviels UKDAX-10EDT
Страница 5: ...3 CONFIGURATION OF THE DEVICE...
Страница 7: ...Boiler installation must be done by authorized personnel 5 INSTALLATION OF BOILER...
Страница 26: ...7 ELECTRICAL DIAGRAM...