MACHINE TYPE
EMV550
EMV450
EMV400
EMV300
EMV70
VPC
EMD140
EMD70
SADDLE ASSEMBLY
Sandwich Mount Condition
Buffer Stop Condition
Top Swivel Condition
Max gap 1mm
(ideally no play)
Greased
Remarks:
CLAMP ASSEMBLY
Serial No.
Static Jaw Condition
Moving Jaw Condition
Greased
Chain Clamp (Serial No. )
Lifting Chain (Serial No. )
Coupler (Serial No. )
Remarks:
PRE-DELIVERY INSPECTION SHEET
EMV’S, VPC’S AND EMD’S
Serial No:
Photo taken before dispatch:
ADAPTOR BRACKET / QUICK HITCH ASSEMBLY
Adaptor Pin
Diameter
Length
Bushes List
Additional Spares Supplied
GEARBOX ASSEMBLY
Oil Level
Leaks
(Visual)
Case Breather Valve
Motor Blow off Valve
General Condition
Remarks:
HOSES
Hoses Condition
Spring Guard Condition
Running Leaks
Fittings
Additional Spares Supplied
Remarks:
Inspection Time / Date:
Inspector Name:
Stand:
Remarks:
VIBRO RUNNING CHECKS
Cycle Clamp x5 to Check Function
Close Clamp Stop Vibro & Leave for 5 mins (CLAMP MUST STAY CLOSED)
Run Vibro and Check for External Leaks
Hoses
Fittings
Motor Blow Off Valve
QRC
Maximum gap allowed due to wear.(see photo)
Check using a crowbar to force apart assembly, then
insert a feeler gauge at least 20mm into gap, if more
than 1mm change lifting bolt and nut immediately and
check other components replacing as required.
Содержание 5600D EMV550v3
Страница 2: ...April 2013 V3 DAWSON CONSTRUCTION PLANT LIMITED DAWSON EMV 550 OPERATORS INSTRUCTIONS SPARE PARTS LIST...
Страница 22: ...DAWSON DAWSON DAWSON DAWSON DAWSON CONSTRUCTION PLANT LIMITED 9 0 PARTS LIST FOR THE EMV550...
Страница 29: ......
Страница 32: ......
Страница 34: ......
Страница 35: ...6621 0 2 7 1 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17...
Страница 47: ......
Страница 52: ...STAND Remarks Inspect general condition of stand...