e.
Start the vibrator and allow the soil to loosen around the pile. Start to lift up the
pile. Ensure the pile clutches are not rubbing together. Pay attention to the
distortion of the rubber sandwich mounts - under no circumstances should these
mounts be allowed to deflect by more than the amount shown below:
Reduce the extraction force to continue pulling. Continue extracting the pile until
the pile foot is almost extracted. Stop vibration at this point and carefully pull the
pile out the remaining short distance.
f.
Move the pile to a suitable area, and place the pile on the ground. Ensure that all
personnel are out of the Danger Area.
g.
Hold the pile on the ground and release the jaws. Raise the vibrator off the pile
slowly ensuring that there is no snatch on the lifting chain. Slowly lower the pile
towards the ground.
h.
Remove the lifting chain and chain clamp from the pile lifting hole.
i.
Repeat steps b-i to continue.
Содержание 5600D EMV550v3
Страница 2: ...April 2013 V3 DAWSON CONSTRUCTION PLANT LIMITED DAWSON EMV 550 OPERATORS INSTRUCTIONS SPARE PARTS LIST...
Страница 22: ...DAWSON DAWSON DAWSON DAWSON DAWSON CONSTRUCTION PLANT LIMITED 9 0 PARTS LIST FOR THE EMV550...
Страница 29: ......
Страница 32: ......
Страница 34: ......
Страница 35: ...6621 0 2 7 1 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17...
Страница 47: ......
Страница 52: ...STAND Remarks Inspect general condition of stand...