background image

-

-

-

-

-

5618D

08/09/2009

peter watts

peter watts

Clamp Assembly

-

Qnt.

Ref.no.

Part name

Material

Dimension

Remark

1

H

G

F

2

3

4

5

6

7

8

9

10

H

G

F

E

7

8

D

C

B

9

10

A

Copied

Design by

Drawn by

Checked

Standard

Scale

Affirmed

Drawing no.

Sheet

Replace

Date

Replaced by

Qnt.

Rf.nr

Revision

Appr.by

Date

Intro.

DAWSON

CONSTRUCTION

PLANT LTD.

ROUGH MACHINE N9

FINE MACHINE   N8

GRIND          N6

UNLESS STATED OTHERWISE

SURFACE FINISH

X . X = +/- 0.25

/- 0.5°

MACHINING TOLERANCES
UNLESS STATED OTHERWISE

X . XX = +/- 0.05

DIMENSIONS IN MILLIMETERS

X = +/- 0.5

A3

E

D

C

B

A

1

2

3

4

5

6

3RD ANGLE

EMV 550

1 of 1

10

18

13

21

23

24

12

2

10

3

1

19

General Notes:-
EMV550 = 550kN = 55tonne Centrifugal force
Clamping force 66 Tonne @ 230 Bar
Approximate Weight 435Kg

A

ITEMS 9 AND 26 SCREW LENGTHS

INCREASED

PLW

040609

50

26

4

0.375'' BSP Dowty Washer

(CFG 3801)

H00150

25

2

DOWTY WASHER

0.250"

H00127

24

1

Jaw Pad Support

EN24T

5761-1

23

1

Adaptor

GRADE BD2

5760

22

1

Headed Bush

EN1A

5685

21

1

Chain Holder

5684M

20

1

Chain Holder

5684

19

1

 Clamp Cylinder

5616A

18

1

Bush

BRONZE GRADE LB4

5615

17

1

Moving Jaw Pad

EN36B

5614-1

16

1

Fixed Jaw Pad EMV550

EN36B

5613-1

15

1

Clamp Body Machined Casting

BS31000 GRADE BT2

5612D

14

1

STRAIGHT GREASE NIPPLE

M10

4767

13

2

Chain Clamp

50B

4682

12

2

MB4/MJ6 1/4"BSP -9/16" JIC

4279

11

4

MB6/MJ6 3/8"BSP -9/16" JIC

4217A

10

1

SOCKET HEAD CAP SCREW

M20 x 150 LG

0M20-150-02

9

1

Spring Pin

Ø20 x 130

0M20-130-22

8

8

HEX HD BOLT

M20 x 65Lg

0M20-065-01

7

9

NORD-LOCK WASHER

M20

0M20-000-27

6

12

SOCKET HEAD CAP SCREW

M16 x 250Lg

0M16-250-02

5

4

SOCKET HEAD CAP SCREW

12.9

M16 x 60 LG

0M16-060-02

4

16

NORD-LOCK WASHER

M16

0M16-000-27

3

1

Spring Pin

Ø12 x 130

0M12-130-22

2

4

HEX HD BOLT

8.8

M12 x 35LG

0M12-035-01

1

4

NORD-LOCK WASHER

M12

0M12-000-27

22

8

20

5

9

14

4

6

25

4

7

11

16

17

15

26

Содержание 5600D EMV550v3

Страница 1: ...TOR MOUNTED DRILLS QUIET VIBRATIONLESS PUSH PULL PILING PILE EXTRACTION SHEET PILE GUIDE FRAMES SHEET PILE CAPPING SYSTEMS CFA CLEANERS PILE POINTS SPLICERS HANDLING LIFTING www dcpuk com EMV 550 Metr...

Страница 2: ...April 2013 V3 DAWSON CONSTRUCTION PLANT LIMITED DAWSON EMV 550 OPERATORS INSTRUCTIONS SPARE PARTS LIST...

Страница 3: ...uctions 5 1 Preparations before driving extracting piles 5 2 Driving piles 5 3 Extracting Piles 6 0 Maintenance 6 1 Daily Maintenance 6 2 Every 50 working hours 6 3 Every 1000 working hours 7 0 Troubl...

Страница 4: ...xtremely versatile and readily adapts to most suit excavators from 30 to 55 tonnes Hydraulic power supply is taken from the excavators bucket ram circuit providing adequate power is available Other th...

Страница 5: ...pm CENTRIFUGAL FORCE 550 kN AMPLITUDE PEAK TO PEAK 13 mm HYDRAULIC PRESSURE MIN MAX 280 350 bar HYDRAULIC FLOW RATE MIN MAX 256 400 L min MINIMUM HYDRAULIC POWER 120 kW DYNAMIC MASS 1 150 kg TOTAL MAS...

Страница 6: ...f or responsible for the use and maintenance must ensure that the vibrator and all it s auxiliary equipment are in good condition Piling should only be carried out under the supervision of an appropri...

Страница 7: ...s to prevent contamination Disconnect the vibrator from the excavator 2 1 6 Transporting Piles on Site Transporting a pile using the vibrator should only be done over a small distance with the clamp f...

Страница 8: ...ng effect can occur Also the ground effectively sticks itself to the pile and much of the power generated is lost in shaking the ground The EMV is particularly effective for its size and weight becaus...

Страница 9: ...to installing the EMV A shear pin is used to fix the vibrator to the boom via an adaptor bracket Different adaptor brackets may be required for different excavators Check this prior to the start of in...

Страница 10: ...they should be replaced It is strongly recommended that quick release couplings are not used for this application For permanent installation ball valves can be added to the excavator boom to ensure r...

Страница 11: ...tion 2 1 Basic Safety Points in this manual before starting work f Review section 6 1 Daily Maintenance before taking the equipment into service g It is particularly important that you make sure that...

Страница 12: ...control lever from one extreme position to the other whilst the EMV is running it will cause hydraulic system pressure spikes to occur i Remove the chain clamp and lifting chain from the pile lifting...

Страница 13: ...ue extracting the pile until the pile foot is almost extracted Stop vibration at this point and carefully pull the pile out the remaining short distance f Move the pile to a suitable area and place th...

Страница 14: ...an or by one of their approved distributors once a year or every 1000 working hours 6 1 Daily Maintenance a Grease the two grease points on the EMV550 one on the Saddle Swivel and the other on the sid...

Страница 15: ...e hexagonal wrench Ensure the clamp functions correctly after completing the work g Inspect the rubber Sandwich Mounts Elastomers for wear or damage Wear is typified by splitting tares This usually oc...

Страница 16: ...Swivel Assembly Gear Box Oil Sight Glass Clamp Body Grease Point for the Moving Jaw Clamp Cylinder Hard Jaws Gearbox Oil Drain Plug Breather Filler Plug...

Страница 17: ...with viscosity class SAE 75W 90 will be suitable Alternatively in hotter climates fully synthetic oil of the same classification may be used For example Manufacturer Mineral Oil Reference Synthetic Oi...

Страница 18: ...equate supervision 7 1 EMV clamp does not close 7 1 1 Check that base machine hydraulics lines are correctly connected see section 4 2 Operate control lever in both directions to check flow directions...

Страница 19: ...case the unit usually runs very slowly unless metal fragments have become entrapped in the transmission system as a result 7 2 6 Remove the motor from the gearbox and test 7 2 7 As a last resort take...

Страница 20: ...4 3 Long drain hose or the hose bore too small either of these can contribute to an increase in back pressure 7 4 4 Extremely cold weather if the base machine hydraulic oil is of an inappropriate visc...

Страница 21: ...ars for any signs of damage Remove all bearing covers from the gearbox sides and inspect the outer races for signs of grooves or any other contamination or damage look at the rollers in each bearing T...

Страница 22: ...DAWSON DAWSON DAWSON DAWSON DAWSON CONSTRUCTION PLANT LIMITED 9 0 PARTS LIST FOR THE EMV550...

Страница 23: ...LT M20 x 35LG 0M20 035 01 1 3 SPRING WASHER M20 0M20 000 21 32 1 O RING O Ring 139 37 x 2 62mm Nitrile BS161 Shamban ref ORAR00161 P2 610 15 01 31 2 O RING H00345 30 4 CYLINDRICAL ROLLER BEARING NJ231...

Страница 24: ...5 A3 E D C B A 1 2 3 4 5 6 3RD ANGLE 1 of 1 EMV550 SECTION A A 5 6 13 2 14 2 SOCKET HEAD CAP SCREW OM24 35 02 OM24 35 02 13 4 CYLINDRICAL ROLLER BEARING NJ2319 E TY P2 HJ2319E 5632 12 4 O RING 221 84...

Страница 25: ...IN MILLIMETERS X 0 5 A2 1 of 1 SECTION A A 3 4 5 10 12 13 14 15 2 1 16 2 O RING 0 0 kg H00345 15 1 HYDRAULIC MOTOR F12 80 36 0 kg 5675 1 14 1 EMV 550 GASKET 0 5 kg 5619 13 1 Drive Gear 14 8 kg 5610 1...

Страница 26: ...f 1 1 1 M5 Dowety 0M05 000 25 2 1 SOCKET HEAD CAP SCREW 0M05 016 02 0M05 016 02 3 6 NORD LOCK WASHER M16 0M16 000 27 4 3 BLANKING PLUG 1 8 BSPT 1 018 22 01 5 1 Check Valve Cartridge ERVE G1 2 HYDAC 46...

Страница 27: ...ty Washer CFG 3801 H00150 25 2 DOWTY WASHER 0 250 H00127 24 1 Jaw Pad Support EN24T 5761 1 23 1 Adaptor GRADE BD2 5760 22 1 Headed Bush EN1A 5685 21 1 Chain Holder 5684M 20 1 Chain Holder 5684 19 1 Cl...

Страница 28: ...ACHINING TOLERANCES UNLESS STATED OTHERWISE X XX 0 05 DIMENSIONS IN MILLIMETERS X 0 5 A3 E D C B A 1 2 3 4 5 6 3RD ANGLE 1 of 1 10 1 SLEEVE TLR368 9 1 G10 Chain Coupler TLR362 8 1 10mm Chain TLR361 7...

Страница 29: ......

Страница 30: ...1 48 NYLOC NUT TYPE T M12 0M12 000 12 2 122 WASHER ST STEEL M12 0M12 000 20 3 26 HEX HD BOLT ST STEEL M12 x 25LG 0M12 025 01 4 48 HEX HD BOLT M12 x 40LG 0M12 040 01 5 2 NYLOC NUT TYPE T M16 0M16 000...

Страница 31: ...Revision Appr by Date Intro DAWSON CONSTRUCTION PLANT LTD ROUGH MACHINE N9 FINE MACHINE N8 GRIND N6 UNLESS STATED OTHERWISE SURFACE FINISH X X 0 25 ANGLES 0 5 MACHINING TOLERANCES UNLESS STATED OTHERW...

Страница 32: ......

Страница 33: ...andard Scale Affirmed Drawing no Sheet Replace Date Replaced by Qnt Rf nr Revision Appr by Date Intro DAWSON CONSTRUCTION PLANT LTD 3RD ANGLE ROUGH MACHINE N9 FINE MACHINE N8 GRIND N6 UNLESS STATED OT...

Страница 34: ......

Страница 35: ...6621 0 2 7 1 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17 09 03 55 1 0 17...

Страница 36: ...NDARD LIFTING CHAIN ARRANGEMENT LIFTING CHAIN FOR DOUBLE CLAMP 4681D FITTING TO CHAIN HOLDER OVERALL VIEW EMV MODEL TO MAINTAIN AMPLITUDE IN EXCESS OF 4MM MAX RECOMMENDED PILE MASS 450 1000KG 550 1400...

Страница 37: ...0 205 240 22 7 8 12 M16 x 2 72 000 106 000 124 000 215 310 370 24 61 64 14 9 16 M18 x 2 5 91 000 129 000 151 000 300 430 510 27 1 1 16 14 9 16 M20 x 2 5 117 000 166 000 194 000 430 620 720 30 1 3 16 1...

Страница 38: ...to the excavator Enviromentally friendly low noise localised directional vibration Automatic hydraulic clamp operation Flexiblity in application Flow regulator prevents excessive oil supply to vibrat...

Страница 39: ...60 88 120 DYNAMIC MASS INCLUDING UNIVERSAL CLAMP lbs 781 814 1 380 2 240 2 576 kg 355 370 625 1 008 1 150 TOTAL MASS INCLUDING UNIVERSAL CLAMP lbs 1 122 1 155 2 123 2 834 3 360 kg 510 525 965 1 275 1...

Страница 40: ...28 EMV 550 EMV 450 EMV 300 EMV 70 30 Clamps Mass 300 Universal Clamp 163 kg 450 Universal Clamp 273 kg 550 Universal Clamp 416 kg Caisson Beam with Clamps 670 kg SPECIFICATION UNITS VIBRO MODEL EMV70...

Страница 41: ...ulic power As a guide the EMVs typically suit the following base machine sizes EMV70 requires 30 L min 240 bar 5 5 17 t excavator EMV220 requires 90 L min 280 bar 7 22 t excavator EMV300 requires 130...

Страница 42: ...0 mm 3 2 tonnes 4082 8 mm 2 tonnes Features SWL of 2000 kg for the 8 mm chain clamp 3200 kg for the 10 mm chain clamp 8000 kg for the 16 mm chain clamp Robust high strength steel body Designed to with...

Страница 43: ...because its mounted on your excavator you can drill vertical holes anywhere the excavator goes It s ideal for drilling over casings on railway embankments under bridges or near power lines anywhere w...

Страница 44: ...6 59 6 7 5 7 72 6 217 18 48 30 17 7 1 7 0 25 1 63 7 216 25 6 16 7 287 127 25 1 855 1 2 7 216 DZVRQ RQVWUXFWLRQ 3ODQW WG KHVQH ROG OHDN DOO 0LOWRQ H QHV 0 1 QJODQG 7HO D 09 63 9 725 02817 9 5 725 9HU 0...

Страница 45: ...Spares Supplied GEARBOX ASSEMBLY Oil Level Leaks Visual Case Breather Valve Motor Blow off Valve General Condition Remarks HOSES Hoses Condition Spring Guard Condition Running Leaks Fittings Addition...

Страница 46: ...EAK HALL MILTON KEYNES MK6 1NE ENGLAND TEL 44 1908 240300 FAX 44 1908 240222 EMAIL DAWSON DCPUK COM DAWSON EMV INSPECTION PROCEDURE WORLDWIDE DEALER NETWORK GLOBAL SUPPLY LOCAL SUPPORT A GUIDE TO EMV...

Страница 47: ......

Страница 48: ...REASE DAILY SADDLE ASSEMBLY Remarks Visual inspect saddle for cracks Check sandwich mounts for splits damage Check bump stops for damage Severe wear to pin Wear to adaptor Wear to bush 4QW 5HI QR When...

Страница 49: ...eratures on bearing caps should be even Visual check for oil leaks Bearing Cover Gasket Ensure all bolts are tight Check case breather valve Check oil levels Check motor blow off valve Photo of EMV450...

Страница 50: ...HOSE ASSEMBLY Remarks Check general condition Check spring guard condition Insure fittings are all tight Check for running leaks Severe damage to hose assembly...

Страница 51: ...g jaw wear on teeth and general damage Inspect chain for damage Inspect chain clamp where fitted for damage Severe damage and wear to teeth on jaws on left in comparrison new jaw on right Damage to ch...

Страница 52: ...STAND Remarks Inspect general condition of stand...

Страница 53: ...OR CHANGE SPECIFICATIONS OR DESIGNS WITHOUT NOTICE OR INCURRING OBLIGATIONS Dawson Construction Plant Ltd Chesney Wold Bleak Hall Milton Keynes MK6 1NE England Tel 44 0 1908 240300 Fax 44 0 1908 2402...

Отзывы: