Figure 13. Place the base with Epoxy on the equipment's
surface
Figure 14. Leveling it in the X direction
Figure 15. Leveling it in the Y direction
Figure 16. Leave it dry for 24 hours before installing the
sensor
* Clean the surface with alcohol;
* Apply the 2-part putty epoxy on the bottom surface of the base;
* Place the base on the surface;
* Use the leveling meter to level the surface of the base in 02 directions X and Y;
LEAVE IT COMPLETELY DRY AND HARDEN IN AT LEAST 24 HOURS
* Screw the M6 screw and install the sensor module.
Note: the adhesive base is for a flat surface only or a curved surface with a radius larger than 500mm.
5.3 Connect the M12 cable (for LoRaWAN of Sigfox Version)
Содержание Lidar People Counter
Страница 2: ...Daviteq Optical Sensing Technologies...
Страница 8: ...Daviteq Radar Sensing Technologies...
Страница 9: ...Daviteq Gas Detection Technologies...
Страница 27: ......
Страница 34: ......
Страница 38: ...C m u n i M12 v o c m bi n Si t ch t k t n i M12...
Страница 43: ...Daviteq Electrical Sensing Technologies...
Страница 51: ...Daviteq Ultrasonic Level Distance Measuring Technologies...
Страница 57: ...Thermal mass flow Pitot tube Orifice plate Daviteq Air Gas Flow Measurement Technologies...
Страница 64: ...Figure 12 Adjust the orientation of the probe 5 7 Attach the Wireless Transmitter to the probe...
Страница 67: ...Daviteq Inertial Measurement Technologies...
Страница 80: ...Daviteq Pressure Measurement Technologies...
Страница 87: ...Tel 84 28 6268 2523 4 ext 122 Email info daviteq com www daviteq com...
Страница 88: ...Daviteq Soil Measurement Sensors...