INSTALLATION AND SET UP
35
3
3 INSTALLATION AND SET UP
3.1 CONNECTIONS
This section of the manual describes the marking system wiring. Carry out the connecting operations as
described below.
WARNING!
Connect the components of the marking system together
WITHOUT
voltage in order to avoid risks to
the operator and to the marking system.
3.1.1 CONNECTING COMMAND BOX CABLE
Figure 28: Connecting Command Box cable.
NOTE:
The Command Box cable must always be inserted in order to use Enable and Key on the front panel
of the rack.
Содержание VLASE IR 1PWX-TLS2
Страница 1: ...USER S MANUAL VLASETM IR ...
Страница 34: ...VLASETM IR 34 2 2 6 CONNECTION EXAMPLES Figure 27 Connection examples ...
Страница 59: ...USE AND OPERATION 59 4 Edit Filling properties such as filling type interline etc using the Properties browser ...
Страница 78: ...VLASETM IR 78 6 6 4 RACK HANDLES Handles for rack fastening are available on request Figure 64 Rack handles ...
Страница 85: ...85 EXTERNAL LABEL PLACING Figure 67 Positioning of external labels rack ...
Страница 86: ...86 Figure 68 Positioning of external labels resonator ...
Страница 90: ...90 BLOCK DIAGRAM VLASETM SAFETY LOGIC DETAILS FOR AUTOMATIC PRODUCTION LINE ...
Страница 108: ...108 APPENDIX G MECHANICAL DRAWINGS ...
Страница 109: ...109 NOTE Please refer to Datalogic website for detailed drawings ...
Страница 112: ......