PRE-INSTALLATION CHECKLIST
4
PWR-240B
SYSTEM WIRING: AC INPUT
4. To comply with EN 60950-1:2007 par.1.7.2.2, par. 2.7.1, par 2.7.4, par. 3.4.6, and to
protect the AC input connection to the device; a disconnecting device with built in
overcurrent and earth protection shall be installed external to the equipment
according to local regulations.
According to EN 60950-1:2007 par. 3.2.3; the AC input cable must have a maxi
-
mum diameter of 14mm and the conduit a max diameter of 16mm.
5. With AC line voltage OFF, wire the AC Line to the AC Line Input Terminal Block see
AC Line Input Voltage" on page 12
.
SYSTEM WIRING: TEST
6. Apply the AC line voltage from the building installation or the DWS-SWITCH and
check that the PWR powers up correctly. The green DC-OK light should be on
steady and the overload light (red) should off.
7. Close and lock the PWR enclosure and check that it does not open (lock functions
correctly).
The PWR-240B installation is now complete.