vi
C-BOX 100
Figure B
Power switch (ON/OFF)
1
2 Chassis grounding selector
3 20 mA C.L. connector
5
4 Power on LED (green)
Power Polarity Error LED (red)
6 Scanner selection switch
Auxiliary port connector
7
OM4000 jumpers
8
Termination resistance switch
9
Spring clamp terminal blocks
10
2
6
1
10
9
8
7
5
4
3
Содержание C-BOX 100
Страница 1: ...C BOX 100 Installation Manual...
Страница 2: ...C BOX 100 Installation Manual...
Страница 3: ...C BOX 100 INSTALLATION MANUAL...
Страница 10: ...viii...