Installing Enclosures
96-30065-001 Rev. A0
DataDirect Networks EF4024 FC RAID System Setup Guide | 19
❖
Controller enclosure
next
Depending upon the number and type of disks in the system, it may take several
minutes for the system to become ready.
❖
Data host
last
(if powered down for maintenance purposes)
TIP:
In general, when powering off, you will reverse the order of steps used for
powering on.
2.3.1
Powering on the System
To power on the system:
1.
Connect one end of the power cords to the power cord connectors on the back of all
expansion
enclosures
(Figure 11)
. Only the power cords supplied with the enclosures
should be used.
2.
Connect the other end of the power cords to the rack power source
(Figure 12)
. For
redundancy, connect the two power supplies to separate power source.
3.
Allow a couple of minutes for the disks to spin up.
4.
Similarly, connect the power cords between the controller enclosure’s power supplies
and the rack power source. Only the power cords supplied with the enclosures should
be used.
Figure 11. Power Cord Connector on Power Supply Modules
Power Cord Connector
Figure 12. Connect Power Cords to Rack Power Source
Содержание EF4024 FC
Страница 1: ...EF4024 Setup Guide Document No 96 30065 001 Revision A0 Fibre Channel RAID System ...
Страница 21: ...96 30065 001 Rev A0 DataDirect Networks EF4024 FC RAID System Setup Guide 21 Chapter 3 3 0Connecting Hosts ...
Страница 29: ...96 30065 001 Rev A0 DataDirect Networks EF4024 FC RAID System Setup Guide 29 Chapter 4 4 0Basic Operation ...
Страница 31: ...96 30065 001 Rev A0 DataDirect Networks EF4024 FC RAID System Setup Guide 31 Chapter 5 5 0Troubleshooting ...
Страница 45: ...96 30065 001 Rev A0 DataDirect Networks EF4024 FC RAID System Setup Guide 45 Appendix A A 0 LED Descriptions ...
Страница 73: ...World Headquarters 9351 Deering Avenue Chatsworth CA 91311 ddn com Phone 1 818 700 7600 Fax 1 818 700 7601 ...