AIR-COOLED FLUID COOLER
6
•
Air-Cooled Condenser Manual
Loose items such as remote-controller display panel, disconnect switch handles or other items
are packed inside the unit. Refer to the yellow shipping tag located on the door for details.
Before unpacking the fluid cooler, verify that the labeled equipment matches the bill of lading.
NOTICE:
Freight damage claims are the responsibility of the purchaser.
Action to recover losses should be filed immediately. Please notify factory
personnel of any claims.
1.3
Paperwork
Each Data Aire unit ships with paperwork which includes a start-up sheet that should be
completed during installation. Return the completed Start-Up Sheets to the factory to validate
the warranty. Also included in the paperwork is a warranty/information packet that provides
important wiring diagrams, specific component literature, warranty registration cards and other
valuable paperwork including a copy of this Installation, Operation and Maintenance Manual
(IOM). A yellow tag is attached to the outside panel of the unit to indicate articles that may
have been packaged and shipped loose within the unit that are not factory mounted.
NOTICE:
It is the responsibility of the installing contractor to return the Start-
Up Sheet and Warranty Registration card to Data Aire for proper activation
of the unit warranty. Failure to do so may cause delays and in some cases
void the warranty.
WARNING:
This equipment may contain substance that has been
deemed harmful to public health and the environment. Venting of
refrigerants to the atmosphere is illegal. Refrigerant recovery devices
must be used when installing and/or servicing these types of products.
1.4
Storage
Data Aire equipment comes ready for immediate installation. However, in some instances, it
may be necessary to store the equipment for a period. If you must store the equipment, it
should be done in a dry area, out of the weather, protected from freezing temperatures,
protected from damage by other equipment in storage, or transportation equipment. Avoid
stacking and frequent relocation.
If equipment is stored for longer than 30 days special precautions must be taken to avoid coil
damage. All coils should be charged and sealed with a low pressure (less the 25 PSIG (172
kPa)) inert gas, such nitrogen. This prevents contaminants from entering the coils. When the
seal is broken at installation, the rush of escaping gas verifies the coil is still leak free. If coils
are not charged and sealed, condensation mixes with air pollutants forming a weak acid and
over time can cause pinhole leaks to develop in coil tubes.
Short-term storage is considered 60 days or less from shipment date. Long-term storage is
considered any period beyond 60 days from date of shipment. It is mandatory that a detailed
Содержание DAFC 06
Страница 1: ...1 Air Cooled Condenser Manual ...
Страница 40: ...AIR COOLED FLUID COOLER 40 Air Cooled Condenser Manual Figure 6 Fluid Temperature Sensor Bulbs ...
Страница 42: ...AIR COOLED FLUID COOLER 42 Air Cooled Condenser Manual Figure 8 Fully Insulated Bulbs ...
Страница 44: ...NOTES 44 Air Cooled Condenser Manual ...
Страница 45: ...Publication Fluid Cooler IOM FluidCoolerIOM 03 2022 docx Date 03 2022 ...