37 / 47
3.6.4 Finishing harness
9.6kWh Cabinet-4
BA T 13
BA T 14
BA T 16
BA T 15
9.6kWh Cabinet-3
9.6kWh Cabinet-2
9.6kWh Cabinet-1
BA T 1
BA T 2
B AT 5
BA T 6
BA T 9
BA T 10
BA T 12
B A T 8
BA T 7
B AT 11
BA T 3
BA T 4
Cable bridge
After the cable is connected,
bundle the cables on both sides
of the side door with the cable tie
in the accessory. There are cable
ties on both sides of the cabinet
side door (there are 16 lanyard
bridges on both sides of the
cabinet side door, the right side
shows the top position), as
shown on the left: