background image

page 3 of 10

Oilbuner

Type Gulliver RG3D

GB

K:\framen\instrukt\Dantherm\RG\Engelsk\RG3D\RG3.fm-M1-021114-dm/lbk

Assembling

Dimensioning of oil pipes

One-line system:

The pump is designed to allow working with
two pipes. In order to obtain one pipe working
it is necessary to unscrew the return plug (2),
remove the by-pass screw (3) and then screw
again the plug (2).

It is sufficient to loosen the suction gauge con-
nection (5) and wait until oil flows out.

It is neccesary to install a filter on the fuel sup-
ply line.

Attention:

 Do not start the burner before oil

flows out.

Max lenght of suction line

H

Dimensioning

8/10 mm

10/12 mm

0,5 m

10 m

20 m

1,0 m

20 m

40 m

1,5 m

40 m

80 m

2,0 m

60 m

100 m

1. Suction line
2. Return line
3. By-pass screw
4. Gauge connection
5. 2nd stage pressure adjuster
6. Suction gauge connection
7. 1st stage pressure adjuster
8. Pressure reducer piston
9. 2nd stage valve

10. 1st stage vaæve
11. Auxiliary pressure test point

H

Содержание 970930

Страница 1: ...Oilburner RG3D GB Code No 970930...

Страница 2: ...instruction should be kept in the furnace room The user is responsible for the burners working order and that the following points are observed Regulations The furnace room and the room containing th...

Страница 3: ...ity Max 30 kg h at 10 bar Pump pressure 8 15 bar Approval MK 10 10 1255 1 Pump with pressure reducer 2 Electronic start delaying device 3 Control box 4 Reset button with lock out lamp 5 Flange with in...

Страница 4: ...p cycle K framen instrukt Dantherm RG Engelsk RG3D RG3 fm T2 021114 DM lbk Burner start up cycle Po mbar kW kg h Bmax 0 0 4 0 8 1 2 1 6 2 0 2 4 70 80 90 100 110 120 130 140 150 160 170 180 190 6 7 8 9...

Страница 5: ...icient to loosen the suction gauge con nection 5 and wait until oil flows out It is neccesary to install a filter on the fuel sup ply line Attention Do not start the burner before oil flows out Max le...

Страница 6: ...on the oil supply pipes position to the right or to the left hand side of the burner One line system On the tank installa tion where vacuum can occur in the oil tubes you install a flow control betwe...

Страница 7: ...l to the arrow direction after removing all components the 7 pin plug and earth wire Ignition transformator The ignition transformator is build in in the control box The ignition cables are con nected...

Страница 8: ...nozzle holder 2 and lock it by screw 3 For prospective adjustments of the eletro des assembly loosen screw 4 Combustion head setting It depends on the output of the burner and is carried out by rotati...

Страница 9: ...n Type S Q K framen instrukt Dantherm RG Engelsk RG3D RG3 fm 021115 dm lbk Adjustment Nozzle Pumpetryk bar Burner output kg h 4 combustion head adjustment Set point Airdamper adjustment GPH Angle 1st...

Страница 10: ...ch pressure this can be done by adjusting screw 9 The pressure gauge must be mounted in pla ce of cap 8 When burner shuts down the air damper automai cally closes till a max chimney depressure of 0 5...

Страница 11: ...White X1 S3 B4 T1 T2 N L1 X2 T1 L1 N T2 S3 B4 X2 M MV2 White Black T8 T7 B5 T6 Electronic delaying device 2 1 3 2 1 M TE Control box 550 SMD X3 S S Signaturer TE M C MV RF X2 X3 Electrode Motor Capac...

Страница 12: ...007647 Blast tube 22 80005813 Gasket 23 80005814 Flange 24 80007648 2nd stage air damper reg 25 80007650 Air damper 26 80007652 Fan 27 80007785 1st stage air damper reg 28 80007867 Tube 29 80007784 Hy...

Отзывы: