D2-10 Series Two-Post Lifts
20
P/N 5900249 — Rev. B — February 2021
The following procedure puts the two Equalizing Cables into place at the bottom of the Post;
it is not a
full install of the Equalizing Cables
.
To put the Equalizing Cables into position
:
1.
Put both Posts either flat on the ground or with their tops
elevated on a sawhorse or similar.
The
inside
of the Posts need to be accessible, facing
up. (See figure to the right.)
Slide the Lift Heads away from the bottoms of both
Posts by at least 24 inches / 610 mm, to provide some
space to work.
For Symmetric models, both Equalizing Cables are the
same length, so it does not matter which one you install
first.
For Asymmetric models, the Equalizing Cables are different lengths. You must route the longer
Equalizing Cable over the Overhead Assembly Sheaves closer to the Approach side of the Lift.
The shorter Cable will be routed on the Powerside Post and the longer cable will be routed on the
Offside Post.
Important
: The lengths of each Equalizing Cable are shown on a tag attached to the cable. If the
tags have fallen off, lay the cables out to determine which is longer. The difference may
be only a few inches. However, if you mix them up, the Lift will not work correctly and
you will have to remove them and then re-install them correctly.
Содержание D2-10 Series
Страница 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Страница 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Страница 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Страница 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Страница 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Страница 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Страница 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Страница 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Страница 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Страница 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Страница 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Страница 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Страница 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Страница 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 88: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2021 by BendPak Inc All rights reserved dannmar com ...