Wiring procedure for enclosure types A4–A5, B1–B4, and
C1–C4
1.
Push the cable through the cable glands.
2.
Mount the pre-configured cable wires with the
connectors on the fieldbus option. For cable
specifications, refer to
chapter 3.7.1 Cabling
Requirements
.
3.
Fix the cable to the metal base plate using the
springs, see
Illustration 3.11
.
4.
Tighten the cable glands securely.
130BD972.10
Illustration 3.11 Wiring for Enclosure Types A4–A5, B1–B4, and
C1–C4
Wiring procedure for enclosure types D, E, and F
1.
Mount the pre-configured cable wires with the
connectors on the fieldbus option. For cable
specifications, refer to
chapter 3.7.1 Cabling
Requirements
.
2.
Fix the cable to the metal base plate using the
springs, see
Illustration 3.12
.
3.
Tie down the cable and route it with other
control wires inside the unit, see
Illustration 3.12
.
130BC527.10
Illustration 3.12 Wiring for Enclosure Types D, E, and F
NOTICE
Do not strip the Ethernet cable. Do not ground it via the
strain relief plate. Ground the shielded Ethernet cables
through the RJ45 connector on the BACnet/IP interface.
3.8 Reassembling the Cover
1.
Mount the new front cover and the LCP.
2.
Attach the sticker with the correct product name
to the front cover.
3.9 Applying Power
Follow the instructions in the frequency converter
Operating Instructions
to commission the frequency
converter. The frequency converter automatically detects
the BACnet/IP interface. A new parameter group (Group
8-7) appears.
Installation
Installation Guide
MG92K102
Danfoss A/S © 05/2016 All rights reserved.
11
3
3
Содержание VLT BACnet/IP MCA 125
Страница 2: ......