the following three (3) steps.
7. Keeping the red (+) multimeter lead on the phase 1 AC terminal, place the black (-) multimeter lead on
the DC- terminal. The measured value should be open.
8. Place the black (-) multimeter lead on the phase 1 AC terminal and the red (+) multimeter lead on the
DC+ terminal and record the results. The measured value should be open.
9. Keeping the black (-) multimeter lead on the phase 1 AC terminal, place the red (+) multimeter lead on
the DC- terminal. The measured value should be 0.275V – 0.4V.
10. Repeat Steps 6 through 9 for the remaining Inverter phases.
NOTE
These values can vary depending on the meter being used. The main idea is that the values be consistent between phases.
Figure 4-190 Inverter Diode Measurements (Skiip 613 Shown)
4.22.3 Inverter Cable Harness
Figure 4-191 Inverter Cable Harness
4.22.4 Inverter Cable Harness Removal and Installation
4.22.4.1 Inverter Cable Harness Removal
1. Isolate the compressor power as described in Section 1.8 Electrical Isolation on page 22.
2. Remove the Service Side Cover. Refer to Section 4.1.3.1 Service Side Cover Removal and Installation on
3. Remove the Soft Start. Refer to Section 4.14.3 Soft Start Removal and Installation on page 117.
4. Use two (2) fingers to simultaneously push outward on the Inverter Cable Harness latches. Refer to
Figure 4-192 Harness Removal from Inverter on page 178.
M-SV-001-EN Rev. H-1/23/2023 Page 177 of 294
Содержание Turbocor TT Series
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Страница 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Страница 39: ...Figure 2 6 Compressor Energy and Signal Flow Connections M SV 001 EN Rev H 1 23 2023 Page 39 of 294...
Страница 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Страница 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 282: ...Figure B 2 Compressor Operation Troubleshooting Flowchart Sheet 2 Page 282 of 294 M SV 001 EN Rev H 1 23 2023...
Страница 283: ...Figure B 3 Compressor Voltage Troubleshooting Flowchart Sheet 1 M SV 001 EN Rev H 1 23 2023 Page 283 of 294...
Страница 284: ...Figure B 4 Compressor Voltage Troubleshooting Flowchart Sheet 2 Page 284 of 294 M SV 001 EN Rev H 1 23 2023...
Страница 285: ...Figure B 5 Compressor Voltage Troubleshooting Flowchart Sheet 3 M SV 001 EN Rev H 1 23 2023 Page 285 of 294...
Страница 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...