2.7  PV Connection

WARNING

Do NOT connect PV to earth!

NOTE

Use a suitable voltmeter that can measure up to 1000 V
DC.

PV Connection Procedure:

1.

First verify the polarity and maximum voltage of
the PV arrays by measuring the PV open-circuit
voltage. The PV open-circuit voltage must not
exceed 1000 V DC.

2.

Measure the DC voltage between the plus-
terminal of the PV array and Earth (or the green/
yellow PE cable). The voltage measured should
approximate zero. If the voltage is constant and
not zero there is an insulation failure somewhere
in the PV array. Locate and fix the failure before
continuing.

3.

Repeat this procedure for all arrays. It is allowed
to distribute the input power on the inputs
unevenly, presuming that:

The nom. PV power of the inverter is
not exceeded (6.2 / 8.2 / 10.3 / 12.9 /
15.5 kW).

The maximum short-circuit current of
the PV modules must not exceed 12 A
per input.

4.

On the inverter turn the PV load switch into off
position. Connect the PV cables by means of MC4
connectors. Ensure correct polarity! The PV load
switch can now be switched on when required.

Illustration 2.22 DC Connection Area

CAUTION

When unmated, the MC4 connectors are not IP54. Intrusion
of moisture may occur. In situations where the PV
connectors are not fitted, a seal cap must be mounted
(included in the scope of the delivery). All inverters with
MC4 connections are delivered with seal caps on inputs 2
and 3. During installation, the seal caps of those inputs
that are to be used are discarded.

NOTE

The inverter is protected against reversed polarity but it
will not generate power until the polarity is corrected. To
achieve optimum production, the open-circuit voltage
(STC) of the PV modules must be lower than the max.
input voltage of the inverter (see 

4.1 General Data

),

multiplied with a factor of 1.13. U

OC

, STC x 1.13 ≤ U

MAX

, inv.

2.8  Auxiliary Input/Output 

The inverter has the following auxiliary input/output:

2 x RJ-45 for RS-485

2 x RJ-45 for Ethernet

1 x 8 pole terminal block for RS-485

1 x 10 pole terminal block for

-

PT1000 temperature sensor input x 3

-

Irradiation sensor input

-

Energy meter (S0) input

1 x 2 pole terminal block for relay outputs

Refer to the specifications for an overview of the
communication board and to the inverter user manual for
details regarding auxiliary input configuration via the
display.

2.9  Autotest Procedure

An automatic test of the inverter can be initialised by
activating the inverter autotest procedure:

Via the display, go to [Setup 

 Autotest] and

press OK.

Via the web interface, go to [Inverter level: Setup

 Setup details 

 Autotest] and click on [Start 

Test].

The inverter autotest manual can be downloaded from
www.danfoss.com/solar.

Installation

14

L00410309-09_02

2

2

www.neoenerji.com

Содержание TLX Pro

Страница 1: ...TLX Installation Manual Three phase 6k 8k 10k 12 5k and 15k MAKING MODERN LIVING POSSIBLE SOLAR INVERTERS w w w n e o e n e r j i c o m...

Страница 2: ...nd PV using the PV load switch Ensure that the device cannot be unintentionally reconnected Use a voltage tester to ensure that the unit is disconnected and voltage free The inverter can still be char...

Страница 3: ...y higher than the maximum operating current and depends on the level of solar irradiation PV Load Switch The PV load switch 1 enables safe disconnection of DC current Conformity Go to the download are...

Страница 4: ...14 2 8 Auxiliary Input Output 14 2 9 Autotest Procedure 14 3 Start up and Check of Settings 15 3 1 1 Initial Setup 15 3 2 Troubleshooting 17 3 3 Master Mode 17 4 Technical Data 18 4 1 General Data 18...

Страница 5: ...TLX Series inverter range comprises the variants TLX TLX TLX Pro TLX Pro TLX TLX TLX Pro TLX Pro Common features Power 6 kVA 15 kVA Enclosure IP54 PV connectors MC4 connectors User interface Display S...

Страница 6: ...nection 5 Install PV 6 Install Auxiliary input according to 2 8 Auxiliary Input Output 7 Close the inverter according to 2 4 Opening and Closing the Inverter 8 Turn on AC at the mains switch 9 Set lan...

Страница 7: ...Potential free relay PELV Safe to touch 5 Auxiliary interface RS 485 6 Auxiliary interface Temperature Irradiation Energy meter SO 7 Auxiliary interface Ethernet Other 8 PV load switch The TLX Pro an...

Страница 8: ...ll times For details refer to 4 Technical Data Illustration 2 1 Avoid constant stream of water Illustration 2 2 Avoid direct sunlight Illustration 2 3 Ensure adequate air flow Illustration 2 4 Ensure...

Страница 9: ...ances Observe these distances when installing one or more inverters One row mounting is recommended Contact the supplier for information on mounting in more rows Installation 6 L00410309 09_02 2 2 w w...

Страница 10: ...he inverter is mandatory Use screws that can safely carry the weight of the inverter The inverter must be aligned and it is important that the inverter is accessible at the front to allow room for ser...

Страница 11: ...uides 1 at the top plate to control the inverter horizontally Illustration 2 11 Secure the inverter Lift the inverter upwards 2 over the top of the mounting plate until the inverter tilts towards the...

Страница 12: ...away from the wall plate 2 4 Opening and Closing the Inverter WARNING Remember to observe all ESD safety regulations Any electrostatic charge must be discharged by touching the earthed housing before...

Страница 13: ...p until it falls into place Guide the front cover into place and fasten the two front screws Illustration 2 17 Fasten Front Screws CAUTION The two front screws are the PE connection to the front cover...

Страница 14: ...nnection 3 Open the front cover 4 Insert the cable through the AC gland to the terminal blocks 5 The three mains wires L1 L2 L3 and the Neutral wire N are mandatory and must be connected to the 4 pole...

Страница 15: ...12A 12A 20A 20A 20A Inverter PV module 12A 12A 12A 20A 20A 20A 30A 12A 12A 12A 20A 20A 20A 7A 7A Cabling 12A 12A 12A 12A 12A 12A 12A 12A 12A 7A 7A 2 1 1 1 3 Illustration 2 20 Correct Parallel Connecti...

Страница 16: ...el connection 1 input Current in first input is exceeded thus overloading cable and PV load switch 3 Parallel connection missing All PV power feeds into one input thus risking overload of PV connector...

Страница 17: ...st be mounted included in the scope of the delivery All inverters with MC4 connections are delivered with seal caps on inputs 2 and 3 During installation the seal caps of those inputs that are to be u...

Страница 18: ...t Language The language is set to English at initial start up To change this setting press the OK button Press to scroll down through the languages Select language by pressing OK NOTE To use the defau...

Страница 19: ...e list of countries To select a country press OK Illustration 3 6 Select Grid Code The display will now show Select grid The grid code is set to undefined at initial start up To select grid code press...

Страница 20: ...Mode The TLX Pro and TLX Pro inverters include a Master mode feature that allows one inverter to be appointed as master inverter From the web interface of the master inverter it is possible to access...

Страница 21: ...urrent distortion THD 4 5 cosphiac r Power factor at 100 load 0 99 Controlled power factor range 0 8 over excited 0 8 under excited Power loss Connecting mode 10 W Night time power loss off grid 5 W f...

Страница 22: ...nt 2 At identical input voltages At unequal input voltages Vmppmin can be as low as 250 V depending on total input power 3 Remotely controlled via CLX monitoring and grid management product or third p...

Страница 23: ...15k Austria TOR Hauptabschnitt D4 TOR Hauptabschnitt D2 Belgium Synergrid C10 11 Revisie 2012 06 Synergrid C10 17 revisie 8 mei 2009 Czech Republic Czech Energy Act Act No 458 2000 Article 24 Paragra...

Страница 24: ...ultural zones Must be measured and classified acc to ISA S71 04 1985 Vibration 1G Ingress protection class 54 Max operating altitude 3000 m above sea level PELV protection is effective up to 2000 m ab...

Страница 25: ...m DC Max 1000 V 12 A Cable length 4 mm2 4 8 km 200 m Cable length 6 mm2 3 4 km 200 300 m Mating connector Multi contact PV ADSP4 PV ADBP4 The distance between inverter and PV array and back plus the c...

Страница 26: ...llustration 4 3 TLX Series 8k Cable Losses versus Cable Length m 2 5 mm2 4 mm 2 6 mm 2 10 mm 2 2 1 5 1 0 5 0 0 20 40 60 80 m 150AA046 11 Illustration 4 4 TLX Series 10k Cable Losses versus Cable Lengt...

Страница 27: ...10 mm 2 2 1 5 1 0 5 0 0 20 40 60 80 m 150AA048 11 Illustration 4 6 TLX Series 15k Cable Losses versus Cable Length m Consider also the following when choosing cable type and cross sectional area Ambi...

Страница 28: ...tening Torque 1 Terminal blocks large Straight slot 1 0 x 5 5 mm Min 1 2 Nm 2 Terminal blocks small Straight slot 1 0 x 5 5 mm 0 5 Nm 3 PE Straight slot 1 0 x 5 5 mm 2 2 Nm 4 M16 SW 19 mm 2 3 Nm 5 M25...

Страница 29: ...ter current Iacmax 9 0 A 11 9 A 14 9 A 18 7 A 22 4 A Recommended blow fuse type gL gG 13 A 16 A 20 A 20 A 25 A Recommended automatic fuse type B 16 A 20 A 20 A 25 A 32 A Table 4 8 Mains Circuit Specif...

Страница 30: ...x PT1000 3 Cable specification Cable jacket diameter 4 8 mm Cable type Shielded Single Pair 2 wire Cable shield termination Via EMC cable clamp Maximum wire gauge 2 5 mm2 Maximum resistance per wire 1...

Страница 31: ...mmended for both Ethernet and RS 485 3 Third input is used for compensation of the irradiation sensor 4 The number of inverters to be connected in the RS 485 network depends on which peripheral device...

Страница 32: ...gy meter 7 Relay 1 Table 4 11 Legend to Illustration 4 9 4 9 RS 485 and Ethernet Connections RS 485 Terminate the RS 485 communication bus at both ends To terminate the RS 485 bus Connect Bias H to RX...

Страница 33: ...7 8 Illustration 4 12 RJ 45 Pinout Detail for Ethernet Colour Standard Pinout Ethernet Cat 5 T 568A Cat 5 T 568B 1 RX Green white Orange white 2 RX Green Orange 3 TX Orange white Green white 4 Blue B...

Страница 34: ...ogues brochures and other printed material Danfoss reserves the right to alter its products without notice This also applies to products already on order provided that such alterations can be made wit...

Отзывы: