Fig. 4.1
Fig. 4.2
5.
Preparation to dig the bar into the ground. Tighten the fixtures into the ground (No. 4) to the bottom of the
side - lower bar (No. 1) and the door back bars (No. 8) with M5-12 bolts (27) and M5 nuts (30) (Fig. 5).
Fig. 5
6.
Tighten the prepared side - lower bars (No. 1) to the side parts of the assembled foundation with M5-12
bolts (27) and M5 nuts (30) (Fig. 6.1
–
6.3).
Fig. 6.1
Fig. 6.2
Fig. 6.3
7.
Side - lower bars (No. 1) are fixed by tightening the bar fixing cross bars depending on the length of the
greenhouse (No. 5, No. 6 or No. 7) with M5-12 bolts (27) and M5 nuts (30) (Fig. 10). The same action is to
be carried out on both sides (Fig. 7.1
–
7.2).
Содержание GH140040
Страница 1: ...12 04 2019 for Greenhouse TITAN Classic 480 Manual...
Страница 17: ......