![DALBO AXR-H Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/dalbo/axr-h/axr-h_manual_503813036.webp)
AXR-H
Page 36
Fig. 30
Left side
Right side
1.
Unfold the packer roller to the working position and lower the transport wheels
until the wheels just barely carry the weight of AXR-H, but the T-rings are still
resting on the ground. Support the main frame in this position.
2.
Remove the turnbuckle and the depth indicator.
3.
Support the frame of the packer roller; or even better, suspend the frame with a
strap. Remove the pin (A).
4.
The frame of the packer roller can now be lifted away and the bushings can be
tapped out of the tube.
5.
Insert new bushings and mount the frame of the packer roller again. Remember
to insert the split cotter pin.
6.
Mount the turnbuckle together with the depth indicator. Remember to insert
the split cotter pins.
Replacing Packer Roller Centre Pin
1.
Follow points 1 to 3 under ”
Replacing Packer Roller Depth Adjustment Bush-
ings
”
.
2.
Suspend from the pivot.
3.
Tap out the slotted split pin (B) and unscrew the castle nut. Pull out the pin (C).
4.
Insert the new pin, screw on the castle nut and tighten to a torque 100 Nm, or
until there is no gap between the plates when AXR-H is resting on the packer
roller. Loosen the castle nut until the notch of the castle nut lines up with the
hole in the shaft. Remember to insert the slotted split pin.
A
A
C
B
Содержание AXR-H
Страница 1: ...AXR H GB 400 450 500 600 cm Serial number 1500 1549 ...
Страница 2: ...AXR H ...
Страница 47: ...AXR H Page 47 Hydraulic diagram 400 450 500 ...
Страница 48: ...AXR H Page 48 Hydraulic diagram 600 ...
Страница 50: ...AXR H Page 50 Spareparts ...